| Click on a table row below to view additional information |
|
Project Owner
|
Contract Title
|
JJG Estimate
|
Est Bid Release Date
|
Est Bid Due Date
|
City of Sandy Springs, Georgia Sandy Springs, GA
|
Johnson Ferry Road Streetscape
|
$0
|
3/18/2010
|
4/15/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | |
|
|
|
|
City of Cedartown, Georgia Cedartown, GA
|
Cedartown Main Street Streetscape Phase 2
|
$0
|
3/25/2010
|
4/22/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The Project consists of reconstruction of approximately 2,600 square yards of concrete sidewalk and accompanying header curb, milling of 11,500 square yards of asphalt and subsequent repaving, removal of 2,000 square yards of pavement, installation of storm drains, concrete pavers, signing and marking, granite curbed tree planters, site furnishings, landscaping, lighting and electrical work. Project includes all demolition, grading, excavation, milling, erosion control and other related construction activities. NOI and NPDES monitoring is not required for this Project.
|
|
|
|
Douglasville-Douglas County Water and Sewer Authority Douglasville, GA
|
Standby Generators for the South Central Wastewater Facility
|
$0
|
4/1/2010
|
4/29/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The Project consists of construction of improvements at the South Central Wastewater Facility, including a 1,000-kW diesel engine standby generator at the existing influent pump station; a 1,500-kW diesel engine standby generator at the existing wastewater treatment plant; fuel unloading area and spill containment facilities at each generator location; miscellaneous site grading and drainage improvements; electrical switchgear modifications at each generator location; electric gate openers, call box and remote controls for the gate openers, closed circuit TV security camera, area lights, and irrigation system at an existing entry structure for the wastewater treatment plant; street lights along the treatment plant access road; pipeline to convey treatment plant effluent water to the gate area irrigation system; and electrical and control systems to support the improvements. Modifications to remote control and monitoring systems for the standby generators, pumps, and treatment facilities will be performed under a separate contract with a pre-selected control systems integrator, with coordination of the work under this Project.
|
|
|
|
City of Loudon, Loudon Utilities Board Loudon, TN
|
Loudon Water Treatment Plant 20 MGD Expansion
|
$17,000,000
|
4/8/2010
|
5/6/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct a new water treatment facility with an initial capacity of 2 MGD, including: 900 square foot raw water pump station with associated equipment and electrical room, including standby power generator; 1,600 linear feet of raw water pipeline; flocculation basins; approximately 12,000 square foot treatment building including a skid mounted membrane filtration system, chemical storage and feed systems, filtered water transfer pumping, offices and a small laboratory; standby power generator; 0.5 MG pre-stressed concrete clearwell; earthen sedimentation ponds; 2,400 linear feet of HDPE sediment pond discharge pipeline; 2,900 linear feet of DIP finished water pipeline; and associated site, architectural, mechanical, electrical, and instrumentation and control work.
|
|
|
|
Atlanta-Fulton County Water Resources Commission Johns Creek, GA
|
Atlanta Fulton County Water Treatment Plant Bulk Hypochlorite System and Filter/Plate Settler Improvements
|
$13,000,000
|
4/1/2010
|
5/6/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment and incidentals and performing all work required to perform maintenance upgrades to the filter and plate settler basins on Phases 1 and 2 and convert the disinfection system to bulk deliveries of sodium hypochlorite including: providing access ladders on Phase 1 plate settlers; replacing Phase 2 plate settlers; adding underdrains and/or caps to Phase 1 and Phase 2 filters; demolishing the existing chlorine gas disinfection system; adding a new bulk hypochlorite storage and feed system and storage room; and associated site, architectural, mechanical, electrical, and instrumentation and control work.
|
|
|
|
Columbus Consolidated Government Columbus, GA
|
Flood Abatement Project - 6th Avenue and Side Street System Contact 2
|
$20,000,000
|
4/2/2010
|
5/6/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The project consists of 550 feet of 8-foot by 6-foot box culvert, 790 feet of 8-foot by 8-foot box culvert, 1,100 feet of twin 10-foot by 8-foot box culvert, 1400 feet of 10-foot by 8- foot box culvert, 420 feet of 12-foot by 8-foot box culvert, 60 feet of 14-foot by 8-foot box culvert, 2,100 feet of 14-foot by 12-foot box culvert, 1540 feet of 72-inch gravity sewer, 1,100 feet of 60-inch gravity sewer, 780 feet of 54-inch gravity sewer, 620 feet of 48-inch gravity sewer, 130 feet of 42-inch gravity sewer, 130 feet of 36-inch gravity sewer, 100 feet of 24-inch gravity sewer, 100 feet of 15-inch gravity sewer, 600 feet of 16-inch water main, 500 feet of 12-inch water main, 3,040 feet of 8-inch water main, 00 feet of 6-inch water main, 3 railroad crossings, 1 state road crossing, streetscape improvements, erosion and sedimentation control, all associated restoration connections and appurtenant work.
|
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
South Columbus Water Resource Facility Upgrades
|
$12,000,000
|
4/9/2010
|
5/6/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The project consists of the following: Install two new vortex grit chambers and appurtenances to improve grit removal performance; convert the basins formerly used as aerobic digesters to bioreactors and integrate these basins with the four existing bioreactors into a biological treatment train; replace the aeration equipment in all bioreactors with a fine-bubble aeration system; refurbish the bioreactors to add flexibility of operation; replace the air-lift return sludge pumps with submersible pumps; increase the capacity of the waste sludge line; and install baffles in the chlorine contact tanks.
|
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
North Columbus Water Transmission Main
|
$0
|
4/9/2010
|
5/13/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The Project consists of approximately 2,900 feet of 42-inch, 17,000 feet of 36-inch, 1,000 feet of 30-inch ductile iron pipe water main; 410 feet of 54-inch 1,010 feet of 48-inch and 80 feet of 42-inch bore and jack steel casing; 6,000 square yards of pavement replacement; and erosion and sedimentation control.
|
|
|
|
City of Rome, Georgia Rome, GA
|
South Rome Pedestrian Corridor
|
$0
|
4/15/2010
|
5/13/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The Project includes the construction of pedestrian improvements and street repaving of South Broad Street, East Main Street and East 12th Street between Branham Avenue to Cedar Street in the City of Rome. The work consists of the construction of approximately 6,500 square yards of concrete sidewalk, 1,600 square yards of ADA concrete driveway aprons,12,800 linear feet of concrete header curb, 6,200 square feet of brick pavers, milling of 34,000 square yards of asphalt and subsequent repaving, reconstruction of storm drains, signing and marking, landscaping, lighting and electrical work, 1 traffic signal mast arm assembly and 3 traffic signal strain pole assemblies. Project includes all demolition, grading, excavation, milling, erosion control and other related construction activities. NOI and NPDES monitoring is not required for this Project. The project will have a base bid and three alternates.
|
|
|
|
City of Clarksville, Tennessee Clarksville, TN
|
Clarksville Water Treatment Plant 28 MGD Expansion
|
$27,000,000
|
4/18/2010
|
5/20/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | |
|
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Bruce Street Sanitary Sewer Rehabilitation
|
$0
|
4/16/2010
|
5/20/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | |
|
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Exeter Court Lift Station Upgrade
|
$0
|
4/23/2010
|
5/27/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | |
|
|
|
|
City of Loudon, Loudon Utilities Board Loudon, TN
|
24-Inch Water Main Extension WTP to Blair Road DWSRF 2007-074
|
$0
|
5/6/2010
|
6/3/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The Project consists of approximately 12,000 feet of 24-inch, 4,000 feet of 24-inch, and 3,000 feet of 8-inch ductile iron pipe water main, including crossing the Tennesse River with the 24-inch main.
|
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
North Columbus Water Resource Facility Upgrades
|
$8,000,000
|
6/4/2010
|
7/1/2010
|
|
Request Info: | | Wayne Price
|
|
Notes: | | The project will include: Basin 1 Flocculation and Settling Improvements, Basin 2 Flocculation and Settling Improvements, Basin 3 Flocculation and Settling Improvements, Filter Buildings 1 and 2 Media Replacement, Filter Buildings 1, 2, and 5 Valve Replacement, Partial Yard Valves Replacement, Raw Water Pump Motor and Starter Replacement, Raw Water Intake Structure Improvements, High Service Pump Motor and Starter Replacement, Basin 6 Flocculation and Settling Improvements. Remainder Yard Valves Replacement.
|
|
|
|
|
 |