Project Owner
|
Contract Title
|
Bid Due Date
|
Links
|
Macon Water Authority Macon, GA
|
Stormwater Improvements Projects Group No. 2
|
1/19/2010
|
Bid Results
Planholders List
|
| Notes: | The project consists of rehabilitation of existing storm sewers by the use of cured-in-place pipe, including approximately 510 linear feet of 30-inch, 550 linear feet of 24-inch and 350 linear feet of 18-inch storm sewer; point repairs; construction of new and modifications to existing storm sewer structures; and pavement restoration. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Oxbow Meadows Environmental Learning Center
|
1/15/2010
|
Bid Results
Planholders List
|
| Notes: | The Project will include clearing, grubbing and grading; 7,600 square foot environmental learning center building with architectural, structural, mechanical and electrical components; indoor and outdoor fish and reptile exhibit areas; ancillary sidewalks, driveways and landscaping; stormwater, and potable water lines; power supply lines. Alternate bids will be accepted for 824 square foot building addition and outdoor reptile tortoise area; 800 square foot entrance structure; 800 square foot elevated observation platform; bus drop-off driveway and paving. |
|
|
|
City of Kannapolis, North Carolina Kannapolis, NC
|
Second Creek Pump Station Electrical Improvements
|
1/13/2010
|
Bid Results
Planholders List
|
| Notes: | Electrical improvements to an existing pump station, namely changing the service from 2,300 volt three phase to 480 volt three phase, which will include new service conductors, new switchboard, new pump motors, new variable speed drive with self-contained air conditioning, new lighting and receptacles, new ultra sonic flow meter, demolition of existing electrical equipment and circuits, and generally upgrading to current National Electrical Code requirements. |
|
|
|
Hallsdale-Powell Utility District Knoxville, TN
|
Sanitary Sewer Rehabilitation - Phase 2B
|
12/17/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 75,000 feet of cured-in-place pipe rehabilitation with pipe sizes ranging from 6-inch to 15-inches in diameter; rehabilitation of approximately 80 service laterals with cured-in-place pipe; rehabilitation of approximately 3,300 vertical feet of manholes utilizing cementitious and/or epoxy linings; reinstatement of service laterals, approximately 450 by open cut means; furnishing and installing approximately 75 chimney seal manhole inserts, 65 manhole inflow dish inserts, and 25 manhole frames and covers; and approximately 325 point repairs, ranging in size from 6-inch to 15-inch diameter pipe. |
|
|
|
Broad River Water Authority (BRWA) Spindale, NC
|
Water Treatment Plant Modernization
|
11/18/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: a new rapid mix and flocculation basin; settling basin modifications; chemical feed system replacement; modifications to the raw water, high service and booster pump stations; a new telemetry system; addition of a lime slurry feed system; conversion on chlorine gas to bulk sodium hypochlorite and all associated site work, piping and electrical. |
|
|
|
Watauga River Regional Water Authority Elizabethton, TN
|
Wilbur Lake Regional Water Treatment and Transmission Facilities Contract 4 - Beck Mountain Ground Water Storage Tank
|
11/12/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of a 1 million gallon prestressed concrete ground storage tank with access road and telemetry. |
|
|
|
Watauga River Regional Water Authority Elizabethton, TN
|
Wilbur Lake Regional Water Treatment and Transmission Facilties Contract 3 - South Connector Water Main
|
11/12/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 34,800 feet of 12-inch ductile iron pipe water main. |
|
|
|
Watauga River Regional Water Authority Elizabethton, TN
|
Wilbur Lake Regional Water Treatment and Transmission Facilities Contract 1 - Water Treatment Plant
|
11/12/2009
|
Bid Results
Planholders List
|
| Notes: | The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct a new water treatment facility with an initial capacity of 2 MGD, including: 900 square foot raw water pump station with associated equipment and electrical room, including standby power generator; 1,600 linear feet of raw water pipeline; flocculation basins; approximately 12,000 square foot treatment building including a skid mounted membrane filtration system, chemical storage and feed systems, filtered water transfer pumping, offices and a small laboratory; standby power generator; 0.5 MG pre-stressed concrete clearwell; earthen sedimentation ponds; 2,400 linear feet of HDPE sediment pond discharge pipeline; 2,900 linear feet of DIP finished water pipeline; and associated site, architectural, mechanical, electrical, and instrumentation and control work. |
|
|
|
Watauga River Regional Water Authority Elizabethton, TN
|
Wilbur Lake Regional Water Treament and Transmission Facilities Contract 2 - North Connector Water Main
|
11/12/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 26,000 feet of 16-inch ductile iron pipe water main, including a river crossing using directional bore methodology. |
|
|
|
Hallsdale-Powell Utility District Knoxville, TN
|
Sanitary Sewer Rehabilitation Phase 2
|
11/12/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 60,000 feet of cured-in-place pipe rehabilitation, of which approximately 45,000 feet is 8-inch with the balance being 6, 10, 12, 15 and 18-inch sewers; approximately 2,000 feet of cured-in-place pipe rehabilitation of service laterals; rehabilitation of approximately 300 manholes utilizing cementitious and/or epoxy linings; reinstatement of service laterals, approximately 150 by robotic means and 320 by open cut means; furnishing and installing approximately 40 chimney seal manhole inserts, 40 manhole inflow dish inserts, and 20 manhole frames and covers; and approximately 50 point repairs, ranging in size from 8-inch to 24-inch diameter pipe. |
|
|
|
Hallsdale-Powell Utility District Knoxville, TN
|
North Fork Interceptor Improvements
|
11/12/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of construction of approximately 4,000 feet of 24-inch PVC gravity sewer and 2,650 feet of 12-inch ductile iron pipe, and pipe bursting approximately 2,900 feet of the existing 10-inch sewer with 12-inch HDPE pipe. |
|
|
|
Hallsdale-Powell Utility District Knoxville, TN
|
Willow Fork Interceptor Improvements
|
11/10/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of construction of approximately 2,400 feet of 12-inch PVC pipe, 600 feet of 12-inch ductile iron pipe, and 400 feet of 8-inch ductile iron pipe gravity sewer. |
|
|
|
Athens Utilities Board Athens, TN
|
Collection System Expansion and Rehabilitation Divsion 2 Mount Verd Road Sewer Sytem Extension
|
11/10/2009
|
Bid Results
Planholders List
|
| Notes: | Division 2 consists of two pump stations, 365 feet of 48-inch diameter tunnel, 5,300 feet of 12-inch gravity sewer, and 27,100 feet of 10-inch and 12-inch force main including all associated structures, valves, and appurtenances. |
|
|
|
Athens Utilities Board Athens, TN
|
Collection System Expansion and Rehabilitation, Division 1 Eastern Interceptor Sewer Rehabilitation
|
11/10/2009
|
Bid Results
Planholders List
|
| Notes: | The Project will be let in two contracts. Division 1 consists of approximately 12,600 feet of pipe bursting sewer replacement. |
|
|
|
Hallsdale-Powell Utility District Knoxville, TN
|
Brickey McCloud Elementary School Outdoor Classroom and Stormwater Mitigation Area
|
11/5/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of tree protection/clearing; erosion and sediment control structures; NPDES monitoring requirements; excavation of existing fill; stormwater wetlands; drainage structures and grading; crushed stone paths; asphalt trails; wetland and upland plantings and landscaping; coordination with geotechnical consultant hired by Contractor; interpretive signage; site furnishings; and overlook deck. |
|
|
|
Columbus Consolidated Government Columbus, GA
|
Veterans Parkway Streetscape Enhancement Project
|
10/28/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: Roadway Improvements; erosion control, clearing and grubbing, grading of new medians to include 1,500 CY of top soil, 3,650 feet of concrete header curb, 2,000 feet of 30-inch concrete curb and gutter, 125 feet of 18-inch concrete storm drain pipe, 8 catch basins, and 4 storm sewer manholes. Signing and Marking: 140 SF of highway signs, 280 feet of galvanized steel posts, 25,500 feet of thermoplastic stripping, and thermoplastic pavement markings. Landscaping: 1,300 SY of Corner Plaza paving, 85 pedestrian lights and posts, 40 area lights and posts, planting (only) of 100 Quercus Nuttallii, planting (only) of 50 Lagerstroemia, 1,800 SY of Zoysia sod, and 1,300 SY of Bermuda sod. Signalization: 2,700 feet total of 3-inch and 6-inch directional bore, 120 SF of highway signs, 2,900 feet of steel wire strand cable, 17 strain poles with 30-foot to 60-foot mast arms, 5 traffic installation areas, 24 Type 4, Type 6 and Type 7 polymer concrete pull boxes, 6,000 feet non-metal rigid conduit, 17 Type A intersection video detection assemblies, 1 Type A programming monitor and testing of all systems. |
|
|
|
Metropolitan Sewer District of Greater Cincinnati (MSDGC) Cincinnati, OH
|
Mill Creek WWTP Secondary Treatment Upgrade/Rehab
|
10/27/2009
|
Bid Results
Planholders List
|
| Notes: | The project consists of the upgrade of the Return Activated Sludge (RAS) pumping system and distribution chambers and improvements to the Aeration Tanks and Secondary Clarifiers at the Mill Creek Treatment Plant. The improvements will install an energy dissipating baffling system influent to the Secondary Clarifiers and provide step feed capabilities to the secondary aeration tanks. Additionally, the project will reconfigure piping of the return activated sludge to allow for step feed aeration and sludge stabilization. Upgrade of existing electric substation is proposed as part of the improvements. This project will allow the treatment of 240 MGD through secondary treatment for extended durations as required by the NPDES permit. Other benefits include less pollutant discharge to the Ohio River and less energy costs associated with the secondary treatment process. |
|
|
|
Hallsdale-Powell Utility District Knoxville, TN
|
Automatic Water Meter Reading Equipment Contract 2
|
10/20/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of furnishing approximately 4,064 meters. Installation of meters will be outside scope of this Contract. |
|
|
|
City of West Palm Beach, Florida West Palm Beach, FL
|
Bulk Hypochlorite Storage and Feed System
|
10/14/2009
|
Bid Results
Planholders List
|
| Notes: | The contractor shall furnish all labor, materials, tools, equipment and incidentals and perform all Work required to construct complete in place and ready to operate a sodium hypochlorite storage and feed system. The new system will replace an existing chlorine gas disinfection system. Work includes: demolition of the one ton cylinder chlorine gas handling system, chlorine gas piping, chlorinators, and emergency chlorine gas scrubber; providing bulk storage and transfer pumping equipment in the existing chlorine building; providing metering pumps in a new prefabricated building; providing a hypochlorite day tank; providing temporary sodium hypochlorite storage and transfer system; and associated yard piping and all appurtenances. |
|
|
|
Knox Chapman Utility District Knoxville, TN
|
Raw Water Intake and Pump Station
|
10/8/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the construction of a wetwell with three 75 hp vertical turbine variable speed pumps, one electrical building, two drum style screens, 30-inch intake piping, 24 and 16-inch discharge piping and a compressed air system for backwashing the screens. |
|
|
|
Macon Water Authority Macon, GA
|
Stormwater Improvement Projects Group No. 3
|
9/30/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of stormwater facilities improvements of four different sites including the following: 1. Site #7 - Briarcliff Road: replacing 5 - 24 inch pipes with approximately 180 feet of 54 inch reinforced concrete pipe, repairing the existing roadway, new guardrail, new sidewalk and improving the existing side slopes; 2. Site #9 - Macon Tech Drive: replacing part of the existing storm system with approximately 170 feet of 42 and 48-inch reinforced concrete pipe, replacing 3 storm structures, and repaving a portion of the road; 3. Site #11 - Magnolia Drive: replacing a portion of the existing storm system with approximately 100 feet of 30 and 48-inch reinforced concrete pipe, replacing 2 storm structures, and repaving a portion of the road; 4. Site #14 - Old Club Road: replacing twin 36-inch pipes with approximately 55 feet of double 4-foot x 3-foot box culverts, two new storm structures, 50 feet of 18-inch reinforced concrete pipe and repaving a portion of the road. |
|
|
|
City of Atlanta, Georgia Atlanta, GA
|
RM Clayton WRC Cogeneration Project
|
9/16/2009
|
Bid Results
Planholders List
|
| Notes: | FC-4995, Design/Build of R.M. Clayton WRC Cogeneration Project. The City of Atlanta is soliciting Proposals from qualified proponents for the design and construction of a new facility to produce electricity and hot water from biogas. The major components of the facility will be a 1.6 MW engine generator and a biogas cleaning system. Proposals will be evaluated initially on a review of the written document. Further evaluation may include an oral interview/presentation with the most qualified proponents. The City may negotiate with the most responsive and responsible proponents for the described Work. A Pre-Proposal Conference will be held on Tuesday September 1, 2009, at 10:00 a.m. at the RM Clayton Water Reclamation Center, 2440 Bolton Road, Atlanta, Georgia 30318. A guided tour of the Project site will be conducted on the day of the conference at a time established duringthe Pre-Proposal Conference. The Proposal document may be obtained from the Department of Procurement, Plan Room, City Hall South, Suite 1900, 55 Trinity Avenue, S.W., Atlanta, Georgia 30303, at a cost of $100.00 per package. Planholder list and addenda will only be available from the City of Atlanta. |
|
|
|
City of Cedartown, Georgia Cedartown, GA
|
Cedartown Main Street Streetscape
|
9/3/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of reconstruction of approximately 700 square yards of concrete sidewalk and accompanying header curb, milling of 4,200 square yards of asphalt and subsequent repaving, installation of storm drains, concrete pavers, signing and marking, granite curbed tree planters, site furnishings, landscaping, lighting and electrical work. Project includes all demolition, grading, excavation, milling, erosion control and other related construction activities. NOI and NPDES monitoring is not required for this Project. |
|
|
|
City of Buchanan, Georgia Buchanan, GA
|
Buchanan Square Streetscape Phase II
|
9/3/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the construction of approximately 800 square yards of concrete sidewalk, 900 linear feet of concrete curb and gutter, 380 square feet of brick pavers, 420 linear feet of two-foot average height brick retaining walls, milling of 1,200 square yards of asphalt and subsequent repaving, installation of storm drains, signing and marking, site furnishings, landscaping, lighting and electrical work. Project includes all demolition, grading, excavation, milling, erosion control and other related construction activities. NOI and NPDES monitoring is not required for this Project. |
|
|
|
Cobb County-Marietta Water Authority Marietta, GA
|
James E. Quarles Water Treatment Plant - Plant 2 Rehabilitation
|
8/28/2009
|
Bid Results
Planholders List
|
| Notes: | The project generally consists of rehabilitation of existing Plant 2 facilities including Flocculation Basin Nos. 1-4; Sedimentation Basin Nos. 1-4, and Filter Nos. 1-4; repairs to existing 6-MG Clearwell No. 1; new 6-MG Clearwell No. 2 (prestressed type); variable speed drive addition to one pump in Plant 2 High Service Pump Station; Underdrain Pump Station improvements, including new pumps, variable speed drive controls and piping; chemical building improvements, including alum pump relocation and new fluoride day tank; new Washwater Splitter Box, new Washwater Pump Station No. 2, and new Washwater Clarifier No. 2; replacement of traveling bridge with new rectangular clarifier mechanism in existing Washwater Clarifier No. 1; replacement of piping and valves in Washwater Pump Station No. 1; replacement of pumps and piping in Sludge Pump Station No. 1; structural modifications to the Chemical Building, Plant 2 Filter Complex, Filter Press Building and Plant 2 High Service Pump Station; storm drain rehabilitation with cured-in-place pipe method; yard piping for new and existing facilities; electrical system improvements to support new loads; computer-based controls associated with improvements; remote site telemetry upgrades; site development and storm water management. A mandatory Pre-Bid Conference will be held for all Bidders at 10:00 AM local prevailing time on August 11, 2009 in Conference Room 216 at the James E. Quarles Water Treatment Plant, 4402 Lower Roswell Road, SE, Marietta, Georgia 30068. A Bid submitted by a Bidder not having attended the pre-bid conference will not be opened. The Instructions to Bidders contains technical experience requirements associated with determining a Bidder being responsible. To obtain a copy of such experience requirements free of charge prior to purchasing the Contract Documents, one may contact Theresa Sullivan at 678-333-0381. |
|
|
|
City of Loudon, Loudon Utilities Board Loudon, TN
|
Matlock Bend Pump Station and Force Main
|
8/20/2009
|
Bid Results
Planholders List
|
| Notes: | The project consists of furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate approximately 8,990 feet of 6-inch PVC pipe; 20,200 feet of 12-inch PVC pipe force main; 110 linear feet of 12-inch PVC pipe, 70 feet of 16-inch ductile iron pipe gravity sewer; and the Matlock Bend Pump Station. |
|
|
|
Unified Government of Athens-Clarke County Athens, GA
|
Shoal Creek / Whit Davis Road Interceptor - Modified
|
8/14/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of providing approximately 13,031 feet of 12-inch DIP sanitary sewer force main, 6,110 feet of 18-inch DIP sanitary sewer interceptor, and 38 feet of 8-inch DIP sanitary sewer interceptor, upgrading the existing Weatherly Woods Pump Station, erosion and sedimentation control, and appurtenances. |
|
|
|
Unified Government of Athens-Clarke County Athens, GA
|
SPLOST 2005, Project 001, Group B, Public Water System Improvements
|
8/6/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 25,000 feet of 8-inch ductile iron pipe water main, erosion and sedimentation control, and appurtenances. |
|
|
|
Broad River Water Authority (BRWA) Spindale, NC
|
Water Treatment Plant Modernization Pre-Qualification
|
7/14/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of a new rapid mix and flocculation basin; settling basin modifications; chemical feed system replacement; modifications to the raw water, high service and booster pump stations; a new telemetry system; and all associated site work, piping and electrical. |
|
|
|
Baker Village Redevelopment, LLC Columbus, GA
|
Baker Village Right-of-Way Improvements Phase 2
|
7/10/2009
|
Bid Results
Planholders List
|
| Notes: | The Project site comprises approximately 60 acres with Phase 2 being approximately 14 acres. The Housing Authority intends to redevelop Phase 2 as a new mixed use, mixed income, affordable housing development. The overall development program calls for five phases of development. Demolition of existing development has been completed. Baker Village Phase 1 Right-of-Way and Residential Improvement Projects will be completed prior to Phase 2 work beginning. Phases 1 and 2 are located at the northern end of the site and will contain a total of 296 affordable housing units. The new infrastructure in Phase 2 includes pavement with approximately 1,400 feet curb and gutter, 5.5 feet wide sidewalks on both sides of road, approximately 2,220 feet of 8-inch DIP water mains, approximately 1,280 feet of 8-inch DIP or PVC sewers, and storm drain system (approximately 680 feet of RCP). The sewer and storm trunk lines that convey drainage from Phase 1 to the site outfalls (both sewer and storm outfalls are in the extreme southwest corner of the Project) were constructed initially in Phase 1. The remaining pavement and curb and gutter, curb inlets, secondary sewer and storm lines, and water mains in Phase 2 will be a part of this Project. |
|
|
|
Unified Government of Athens-Clarke County Athens, GA
|
North Oconee Water Reclamation Facility Access Road
|
6/16/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of furnishing all superintendence, skilled and unskilled labor, materials, equipment services, and all other necessary items for the construction of a new access road from College Station Road to the North Oconee Water Reclamation Facility. The improvements include a new intersection at College Station, new full depth paving, new concrete curb and gutter, new sidewalks, new bridge over the North Oconee River, water main, storm sewer system, and stomwater treatment unit. A MANDATORY pre-bid conference to respond to any questions related to the details of the project will be held at 2:00 PM ET, Wednesday, May 27, 2009 at Athens-Clarke County Streets & Drainage, 605 Spring Valley Road, Athens, GA 30605. Potential bidders are encouraged to attend. |
|
|
|
Nassau County, Florida Yulee, FL
|
Leachate Tank Rehabilitation West Nassau Landfill Bid No. NC09-017 PQ
|
6/16/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the rehabilitation of the interior of three 20,000 gallon steel leachate containment tanks at the West Nassau Landfill. The rehabilitation will include the blasting and recoating of the interior of the tanks and any necessary repair work. |
|
|
|
Beaufort-Jasper Water & Sewer Authority (BJWSA) Okatie, SC
|
ISM Projects Group 1 Phase 1 Division II
|
6/11/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: A. Division I 1. Pump Station Rehabilitations – Retrofit of existing pump stations involving partial demolition, new construction and new pumping systems along with structural, architectural, mechanical, electrical, civil and miscellaneous site piping improvements (Pump Stations Nos. 12, 13, 16). 2. New Gravity Sewer - approximately 700 feet of 18-inch gravity sewer (Line A) from Pump Station 20 to Pump Station 13;150 feet of 12-inch gravity sewer (Line B) from Pump Station 29 to Line A tie-in at MH A-3; 800 feet of 18-inch gravity sewer (Line C) from Pump Station 28 to Pump Station 16. 3. Pump Station Demolitions – the demolition of Pump Stations Nos. 20, 28, 29. B. Division II 1. New Gravity Sewer - approximately 1,900 feet of 18-inch gravity sewer (Line D) from Pump Station 19 to Pump Station 7; 100 feet of 18-inch gravity sewer (Line E) from MH E-2 to MH D-10. 2. Pump Station No. 19 Demolition Bidder pre-qualification: Only bids submitted from pre-qualified bidders who have also attended the mandatory pre-bid conference will be opened. The following contractors have been deemed qualified to bid and also attended the mandatory pre-bid conference: Division I Anson Construction Company BRW Construction Group, LLC Chandler Construction Services DuPriest Construction Co., Inc. MB Kahn McClam & Associates R.H. Moore Company, Inc. James F. Pederson Co., Inc. Seaside Utilities, Inc. Southern Champion Construction Co. Division II Anson Construction Company BRW Construction Group, LLC Chandler Construction Services DuPriest Construction Co., Inc. Jordan Construction Terry Lee Construction McClam & Associates R.H. Moore Company, Inc. James F. Pederson Co., Inc. Southern Champion Construction Co. Seaside Utilities, Inc. A mandatory Pre Bid Conference will be held for all Bidders at 10:00 a.m., local time, May 27, 2009, at the offices of the Beaufort-Jasper Water & Sewer Authority, 6 Snake Road followed by an optional site visit. A Bid submitted by a Bidder not having attended the Pre Bid Conference will not be opened. |
|
|
|
Beaufort-Jasper Water & Sewer Authority (BJWSA) Okatie, SC
|
ISM Projects Group 1 Phase 1 Division I
|
6/11/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: A. Division I 1. Pump Station Rehabilitations – Retrofit of existing pump stations involving partial demolition, new construction and new pumping systems along with structural, architectural, mechanical, electrical, civil and miscellaneous site piping improvements (Pump Stations Nos. 12, 13, 16). 2. New Gravity Sewer - approximately 700 feet of 18-inch gravity sewer (Line A) from Pump Station 20 to Pump Station 13;150 feet of 12-inch gravity sewer (Line B) from Pump Station 29 to Line A tie-in at MH A-3; 800 feet of 18-inch gravity sewer (Line C) from Pump Station 28 to Pump Station 16. 3. Pump Station Demolitions – the demolition of Pump Stations Nos. 20, 28, 29. B. Division II 1. New Gravity Sewer - approximately 1,900 feet of 18-inch gravity sewer (Line D) from Pump Station 19 to Pump Station 7; 100 feet of 18-inch gravity sewer (Line E) from MH E-2 to MH D-10. 2. Pump Station No. 19 Demolition Bidder pre-qualification: Only bids submitted from pre-qualified bidders who have also attended the mandatory pre-bid conference will be opened. The following contractors have been deemed qualified to bid and also attended the mandatory pre-bid conference: Division I Anson Construction Company BRW Construction Group, LLC Chandler Construction Services DuPriest Construction Co., Inc. MB Kahn McClam & Associates R.H. Moore Company, Inc. James F. Pederson Co., Inc. Seaside Utilities, Inc. Southern Champion Construction Co. Division II Anson Construction Company BRW Construction Group, LLC Chandler Construction Services DuPriest Construction Co., Inc. Jordan Construction Terry Lee Construction McClam & Associates R.H. Moore Company, Inc. James F. Pederson Co., Inc. Southern Champion Construction Co. Seaside Utilities, Inc. A mandatory Pre Bid Conference will be held for all Bidders at 10:00 a.m., local time, May 27, 2009, at the offices of the Beaufort-Jasper Water & Sewer Authority, 6 Snake Road followed by an optional site visit. A Bid submitted by a Bidder not having attended the Pre Bid Conference will not be opened. |
|
|
|
Columbia County, Georgia Evans, GA
|
Landfill Gas Carbon Credit / Energy Systems - Baker Place Road Landfill - RFP
|
6/4/2009
|
Bid Results
Planholders List
|
| Notes: | Sealed proposals will be received by the PROCUREMENT DEPARTMENT OF COLUMBIA COUNTY, GEORGIA, BUILDING E, 500 FAIRCLOTH DRIVE, EVANS, GEORGIA 30809, until 2:00 PM EDST, Thursday , June 4, 2009 at which time and place they will be publicly acknowledged. Costs will NOT be divulged at that time. A MANDATORY Pre-Proposal Conference will be held at the Columbia County Landfill, 468 Chamblin Road, Grovetown, Georgia 30813 at 2:00 PM EDST on Thursday, May 14, 2009. RFP Number and title (above) should be noted onthe outside of your package. Scope of Work: Columbia County, Georgia is soliciting proposals from qualified companies, or teams of companies, to partner with the County for the opportunity to design, finance, build, own and operate a landfill gas collection and control system and methane destruction/abatement system for the approximately 15-acre closed and lined section of the County`s Baker Place Road Landfill. The project is being developed with the intent to generate revenue through the monetization of carbon credits as well as the option of energy generation. |
|
|
|
City of Portland, Tennessee Portland, TN
|
Sanitary Sewer System Rehabilitation Phase I for Tennessee Stamping & Printworks
|
5/28/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: 12,200 feet of 8-inch and 10-inch cured-in-place piping (CIPP) sanitary sewer rehabilitation; 625 feet of 8-inch open trench sanitary sewer construction; and rehabilitation of approximately 80 manholes. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Emergency Raw Water Storage Tank Replacement Division I - Site Work RFP
|
5/22/2009
|
Bid Results
Planholders List
|
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Emergency Raw Water Storage Tank Replacement - Division I - Site Work
|
5/22/2009
|
Bid Results
Planholders List
|
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Emergency Raw Water Storage Tank Replacement - Division II - Tanks
|
5/22/2009
|
Bid Results
Planholders List
|
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Emergency Raw Water Storage Tank Replacement Division II - Tanks RFP
|
5/22/2009
|
Bid Results
Planholders List
|
|
|
|
City of Thomaston, Georgia Thomaston, GA
|
Silvertown Trail and Trailhead Greatest Generation Memorial Park Phase 1 Trail and Trailhead Phase 2 Fountain and Playground
|
5/21/2009
|
Bid Results
Planholders List
|
| Notes: | Phase 1 consists of furnishing all labor, materials, and equipment for the construction of a 1,200 square foot open pavilion, interactive fountain, playground structure, approximately 15,300 square feet of concrete walkways and patios, 1,000 square feet of brick veneer seatwalls, 450 linear feet of concrete steps, and associated railings, furnishings, appurtenances, grading work, erosion control measures and landscaping. Phase 2 consists of construction of a 1,200-square foot restroom structure, two prefabricated picnic pavilions, 30,700-square foot, 89-space parking lot, approximately 3,400 square yards of concrete walkways and patios, 1,500 feet of twelve-foot wide asphalt trail (950 tons). Project includes all demolition, grading, excavation, milling, erosion control and other related construction activities. NOI and NPDES monitoring are required for this Project. A Pre Bid Conference will be held for all Bidders at 2:00 p.m., local time, April 30, 2009 at 106 East Lee Street, Thomaston, Georgia 30286. |
|
|
|
Macon Water Authority Macon, GA
|
Nisbet Place Storm Sewer Rehabilitation
|
5/18/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of performing structural cured-in-place lining for storm sewer repairs of approximately 680 linear feet of irregular shaped brick storm sewer having a nominal size of 24-inches. Work will also include closed circuit television (CCTV), necessary point repairs, miscellaneous drainage structure reconstruction, and concrete pavement replacement. |
|
|
|
Jefferson Parish Dept. of Purchasing Harvey, LA
|
Harvey Wastewater Treatment Plant Primary Clarifier Improvements
|
5/12/2009
|
Bid Results
Planholders List
|
| Notes: | The improvements include furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate modifications to two primary clarifiers consisting of modification of clarifier drives, and replacement of effluent troughs, effluent weirs, scum baffles, skimmers, effluent drop boxes, scum trough replacement and associated pipe; and installation of PVC liner on the inner walls of the primary clarifiers. |
|
|
|
Beaufort-Jasper Water & Sewer Authority (BJWSA) Okatie, SC
|
ISM Projects Group 1 - Phase 1 Divison I , Division II Pre-Qualification
|
5/8/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of: Division I - Rehabilitations of Pump Stations Nos. 12, 13, 16. Retrofit of existing pump stations involving partial demolition, new construction and new pumping systems along with structural, architectural, mechanical, electrical, civil and miscellaneous site piping improvements. Construction of 1500 feet of 18-inch and 150 feet of 12-inch gravity sewer. Demolition of Pump Stations Nos. 20, 28 and 29. Division II - Gravity Sewer construction of about 2000 feet of 18-inch and demolition of Pump Station No 19. |
|
|
|
Columbus Consolidated Government Columbus, GA
|
Storm Drain Rehabilitation Priority 1 Pipes Contract 3
|
4/22/2009
|
Bid Results
Planholders List
|
| Notes: | The project consists of the following major elements: performing cured-in-place storm sewer repairs as follows: 355 feet of 15 to 18-inch pipe, 1,635 feet of 20 to 24-inch pipe, 1,165 feet of 30 to 36-inch pipe, 1,125 feet of 36-inch pipe, 395 feet of 42-inch pipe, and 375 feet of 48-inch pipe. Performing CCTV inspection of 430 feet of 12 to 15-inch pipe, 460 feet of 20 to 24-inch pipe, 870 feet of 30 to 36-inch pipe, 2,400 feet of 42 to 48-inch pipe, and 660 feet of 18 X 36-inch pipe. Miscellaneous point repairs, manhole height adjustments and installation of manholes. THE CITY WILL ONLY CONSIDER BIDS FROM PRE-QUALIFIED CONTRACTORS. |
|
|
|
City of Sevierville, Tennessee Sevierville, TN
|
Old Knoxville Highway Water Main Extension Phase lll
|
4/14/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 9,600 feet of 24-inch diameter restrained joint ductile iron pipe water main, 315 foot channel crossing of the Little Pigeon River, 520 feet of 36-inch bore and jack steel casing, associated appurtenances, erosion and sedimentation control. |
|
|
|
City of Georgetown, South Carolina Georgetown, SC
|
Maryville Service Area Fire Protection Improvements
|
3/17/2009
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: replacing six existing fire hydrants with new fire hydrants, providing eighteen new fire hydrants and hydrant assemblies, and constructing approximately 2,100 linear feet of 6 inch PVC water mains. |
|
|
|
Union County Public Works (UCPW) Monroe, NC
|
Oak Brook Subdivision Water Main Extension
|
2/12/2009
|
Bid Results
Planholders List
|
| Notes: | The project consists of the construction of approximately 2,900 feet of 8-inch PVC water main, 1,800 feet of 6-inch PVC pipe water main, 140 feet of 8-inch DIP water main, 380 feet of 6-inch DIP water main, 1,100 feet of 2-inch PVC water mains, and appurtenances to serve Oak Brook Subdivision located in Union County. |
|
|
|
North Carolina Ecosystem Enhancement Program (EEP) Concord, NC
|
Dutch Buffalo Creek Stream and Wetland Restoration
|
2/6/2009
|
Bid Results
Planholders List
|
| Notes: | The work will involve restoring approximately 608 linear feet of an unnamed tributary to Dutch Buffalo Creek, enhancing approximately 3,611 linear feet of Dutch Buffalo Creek, preserving approximately 4,678 linear feet of Dutch Buffalo Creek, and preserving approximately 1. 7 acres, enhancing approximately 4.3 acres, and restoring approximately 7.3 acres of wetland area. The project also consists of constructing access crossings across Dutch Buffalo Creek and an unnamed tributary to Dutch Buffalo Creek. |
|
|
|