| Click on a table row below to view additional information |
|
Project Owner
|
Contract Title
|
Bid Due Date
|
Links
|
City of Rome, Georgia Rome, GA
|
Rome Urban Riverfront
|
1/26/2012
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the construction of a Riverfront trail and plaza adjacent the Town Green Park on the Oostanaula River in downtown Rome, and includes 2,000 square yards of sidewalks, 6,700 square feet of concrete pavers, 9,500 exposed square feet of concrete retaining walls with brick veneer, 1,300 exposed square feet of sheet pile retaining wall, 2,200 feet of 42-inch cable guardrail, 250 feet of stainless steel handrail, boat dock with associated outrigger and gangway, along with accompanying staircases, lighting, landscaping and required utilities and other associated work. A Pre-Bid Conference will be held at 2:00 p.m., local time, on January 5, 2012 in the Sam King Room, City Hall, 601 Broad Street, Rome, Georgia 30161. All Bidders and other interested parties are encouraged to attend. To obtain bidding documents, pleaase forward your check for $ 150.00 to Jacobs, 6801 Governors Lake Parkway, Building 200, Norcross, GA 30071, Attn: Theresa Sullivan. No partial sets will be sold. Shipment will be via delivery service - two-day delivery. Other shipping will be at the purchaser`s additional expense. The purchaser may expedite the purchase by faxing a copy of the check to Theresa Sullivan at 678-333-0701, or by scanning and e-mailing same to Theresa Sullivan at theresa.sullivan@jacobs.com, with the original check followed via US Postal Service or via delivery service. Purchases will NOT be processed without all of the following information: (1) Project Name; (2) Purchaser Company Name, (3) Purchaser Street Address; (4) Purchaser Phone Number; (5) Purchaser Fax Number; (6) Contact Person; (7) e-mail address, if available; (8) Purchaser`s Federal Express or UPS account number if quicker delivery is desired. Requests received after 2:00 pm, eastern time, may be processed the following day. |
|
|
|
City of Portland, Tennessee Portland, TN
|
2011 Sanitary Sewer System Rehabilitation CWSRF 2006-192
|
1/17/2012
|
Bid Results
Planholders List
|
| Notes: | The Project consists of rehabilitation of approximately 1,300 feet of 21-inch diameter, and 600 feet of 15-inch diameter sanitary sewer by the cured-in-place pipe method, as well as approximately 150 vertical feet of manhole rehabilitation. Work will also include reinstallation of service taps and all associated work required to pump around existing effluent. |
|
|
|
City of Douglas, Georgia Douglas, GA
|
Douglas Greenway Trail Phase II Section B
|
12/13/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the extension of the existing Douglas greenway trail system by construction of a pedestrian and bicycle bridge across Twenty-Mile Creek, including a pre-fabricated 150 foot long steel truss pedestrian/bicycle bridge with concrete floor and supporting concrete abutments which connect an existing trail and proposed future trail along former railroad right-of-way, concrete trail on both ends of the bridge, adjusting and tying into existing landscape features such as an overlook, bicycle rack and signage, grading and related erosion control measures. A Pre Bid Conference will be held for all Bidders at 2:00 p.m., local time, November 14, 2011, at City Hall, Council Room, 224 East Bryan Street, Douglas, Georgia 31533. Interested Bidders are encouraged to attend. |
|
|
|
City of Kingston, Tennessee Kingston, TN
|
Kingston Wastewater Treatment Plant Expansion and Downtown Pump Station Improvements RE-BID
|
11/8/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of upgrading an existing wastewater treatment facility including new headworks screening structure, grit tank, oxidation ditch splitter box, equalization tank, oxidation ditch, clarifier splitter box, secondary clarifiers, return activated sludge pump station, return activated sludge splitter box, plant drain pump station, septage receiving pump station, modifications to the existing effluent pump station, modifications to the existing sodium hypochlorite feed system, modifications to the existing Downtown Pump Station No. 1, modifications to the plant electrical system, and associated plant piping and site improvements. Bidder Pre Qualification: Pre qualification of Bidders has been completed. Only Bids submitted by properly pre-qualified Bidders will be opened. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Beallwood and Columbus Area Sanitary Sewer Rehabilitation
|
10/27/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of furnishing all work necessary for cleaning, videoing and lining sanitary sewers, predominantly 8-inches in diameter, but ranging up to 24-inches in diameter, with an indefinite quantity magnitude estimated to be 34,000 feet, using the Cured In-Place Pipe (CIPP) method. Estimated Construction Cost Range: $1 Million-$1.5 Million |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Uchee Creek Campground Water and Sewer Service
|
10/27/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of constructing a duplex 335 GPM, 35 HP submersible lift station, approximately 10,800 feet of 16-inch and 16,300 feet of 8-inch ductile iron pipe water main, 14,400 feet of 8-inch ductile iron pipe wastewater force main, 170 feet 16-inch, 360 feet 12-inch ductile iron pipe gravity sewer, 2,300 feet 15-inch, 800 feet 12-inch and 1,600 feet 8-inch polyvinyl chloride pipe gravity sewer, demolition of three existing lift stations, horizontal directional drill crossings of Chattahoochee River consisting of 1,200 feet of 20-inch HDPE and 1,000 feet of 8-inch HDPE, associated appurtenances and erosion and sedimentation control. The Owner will furnish the ductile iron pipe. The Contractor shall furnish all other materials. The work will be performed in the state of Georgia and Alabama. Estimated Construction Cost Range: $2.5 Million-$3 Million Limited Site Tour: A limited site tour will be conducted of the work site under the jurisdiction of the Lawson Army Airfield on October 18, 2011 at 9:00 a.m., Interested attendees should meet in the foyer at 7960 Jacelin Road, Building 2485, Ft. Benning, GA 31905 and said attendees will be directed to a meeting room to allow officials to brief attendees on safety measures during the project site tour. Following such briefing attendees will be escorted to the work site area under Lawson Army Airfield personnel supervision. Attendance is not mandatory, but this will be the only opportunity that persons will be allowed to visit the particular work site prior to receipt of bids. |
|
|
|
Town of Cary, North Carolina Cary, NC
|
South Cary Water Reclamation Facility Reclaimed Water Storage Improvements
|
10/17/2011
|
Bid Results
Planholders List
|
| Notes: | The project consists of the construction of a prestressed composite reclaimed water storage tank with all appurtenances, pumping facilities, yard piping, modifications to existing facilities, site work and piping. |
|
|
|
Seabrook Island Utility Commission Johns Island, SC
|
Seabrook Island WWTP Improvements CWSRF Project No. 727-01
|
10/13/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of furnishing all materials, equipment and performance of all labor necessary to construct the following major elements: A. Division I 1. One headworks with mechanical step-type bar screen, washing press, and bypass with manual bar screen including all piping and accessories; 2. Coarse-bubble diffusers, positive displacement blowers, telescoping valves, and sludge transfer pump including all piping and accessories at the sludge storage tank; 3. Two gravity with polyurethane filter media sludge drying beds including all piping and accessories; 4. One 6,000 gallon sodium hypochlorite fiberglass bulk storage tank with containment, and chemical feed pumps including all piping and accessories; and 5. All related yard piping, process piping, instrumentation, electrical equipment and wiring, and site improvements. B. Division II 1. One 170,000 gallon glass coated, bolted steel sludge storage tank with piping and accessories. A pre bid meeting will be held for all Bidders at 2:00 p.m., local time, Tuesday, September 20, 2011, at the Project site; Seabrook Island Utility Commission, 2902A Seabrook Island Road, Johns Island, South Carolina 29455. All Bidders are encouraged to attend. To obtain bidding documents, pleaase forward your check for $ 300.00 to Jacobs, 4000 Faber Place Drive, Suite 210, Norh Charleston, SC 29405, Attn: Nan Lee. No partial sets will be sold. Shipment will be via delivery service - two-day delivery. Other shipping will be at the purchaser`s additional expense. The purchaser may expedite the purchase by faxing a copy of the check to Nan Lee at 843-747-8175, or by scanning and e-mailing same to Nan Lee at nan.lee@jacobs.com, with the original check followed via US Postal Service or via delivery service. Purchases will NOT be processed without all of the following information: (1) Project Name; (2) Purchaser Company Name, (3) Purchaser Street Address; (4) Purchaser Phone Number; (5) Purchaser Fax Number; (6) Contact Person; (7) e-mail address, if available; (8) Purchaser`s Federal Express or UPS account number if quicker delivery is desired. Requests received after 2:00 pm, eastern time, may be processed the following day. |
|
|
|
City of Loudon, Loudon Utilities Board Loudon, TN
|
Water Treatment Plant Expansion to 20MGD Division II - Treatment Facilities Re-Bid
|
10/6/2011
|
Bid Results
Planholders List
|
| Notes: | The bidding documents will contain minimum experience criteria for being deemed a responsible Bidder. Evidence of meeting the minimum experience criteria must be submitted to the Engineer by 5:00 pm, September 19, 2011 to be allowed to submit a bid. See Instructions to Bidders for further requirements. The Instructions to Bidders, which contains the criteria, will be made available by the Engineer upon request, prior to the purchase of bidding documents. A bid submitted by a Bidder who has not been deemed by the Owner as meeting the minimum experience criteria will not be opened. The scope of the Project is divided into two Divisions. Division I Raw Water Facilities will be constructed under a separate contract. This Division II work will be awarded in one Contract. Division II Treatment Facilities: Construction of the following new facilities: Electrical Building to consolidate multiple utility feeds High Service Pump Station including space for five 8 MGD vertical turbine pumps (two installed) with VFDs (installed in adjacent electrical building) Chemical Building No. 1 which will house chemical feed systems for pre-treatment chemicals, with nearby bulk storage of pre- and post- treatment chemicals Flocculation Basin No. 6 and Sedimentation Basins No. 7 and 8 including turbine flocculators and sludge collection equipment Filter Building Addition including new Filters No. 7 and 8 Modifications to the following existing facilities: Replacement of existing walking-beam flocculators with turbine type flocculators Replacement of sludge collection mechanism in Sedimentation Basins 1 and 2 Rehabilitation of existing Filters No. 1 through 4, including replacement of filter media and underdrains, and the addition of air scour capabilities. Filter controls will also be replaced. Modifications to the existing chemical room in the Filter and Control Building including addition of bulk sodium hypochlorite feed systems, demolition of existing chlorine gas facilities, and conversion of the chlorine room into restrooms and an office Replacement of the existing control and monitoring system with a new fully integrated plant control system Modifications to site grading including addition of access roads and improvement of storm drainage |
|
|
|
City of Cartersville, Georgia Cartersville, GA
|
South Erwin Street 12-Inch Water Main Replacement
|
9/29/2011
|
Bid Results
Planholders List
|
| Notes: | Pre-qualification of Bidders has been completed. Only Bids from pre-qualified Bidders will be opened. The Project consists of approximately 3,640 feet of 12-inch, 50 feet of 10-inch, 380 feet of 8-inch, 440 feet of 6-inch, and 80 feet of 4-inch ductile iron pipe water main; service connections, erosion and sedimentation control measures and appurtenances. 12-Inch ductile iron pipe will be furnished by the Owner. |
|
|
|
Columbus Consolidated Government Columbus, GA
|
Prequalification for Construction of Pine Grove Municipal Solid Waste Landfill Phase 4- Cells 4A
|
8/24/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of clearing and grubbing, earthwork (cut/fill) to subbase elevations, placement of 24-inch thick liner base with permeability not to exceed 1 x 10-7 cm/sec; placement of either a 24-inch thick leachate collection layer with a permeability no less than 1 x 10-2 cm/sec or placement of geonet and 24 inches of a soil layer with no specified permeability; a 60 mil HDPE geomembrane liner over 16.5 acres; the construction of 1,300 feet of 24-foot wide gravel access road; installation of erosion control devices; installation of underdrain, leachate collection and force main piping. Prequalification information can be obtained from the Columbus Consolidated Government website. |
|
|
|
City of Cartersville, Georgia Cartersville, GA
|
South Erwin Street Water Main Replacement Pre-Qualification
|
7/21/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 3,600 feet of 12-inch owner-supplied ductile iron pipe water main; approximately 1,100 feet of ductile iron pipe water main four to ten inches in diameter; numerous water service connections and service lines; erosion and sedimentation control measures and appurtenances. Pre qualification of Bidders for the Project is required. A copy of the qualification requirements can be obtained from the Office of the City of Cartersville Water Department, 148 Walnut Grove Road, Cartersville, GA 30120, (phone: 770-387-5653 / fax: 770-606-2386). Applications for pre qualification for bidding will be received at the Water Department until 4:00 p.m., local time, July 21, 2011. It is anticipated that all applicants submitting pre qualification documentation will be notified of their status by August 5, 2011. ONLY BIDS PROPERLY SUBMITTED BY PRE QUALIFIED BIDDERS WILL BE OPENED. |
|
|
|
City of Portland, Tennessee Portland, TN
|
Portland 2009 Sewer System Improvements CDBG Project
|
7/14/2011
|
Bid Results
Planholders List
|
| Notes: | The project consists of construction of a new 100 GPM submersible grinder pump station and 4,200 feet of 4-inch PVC force main sewer and removal of existing pump station. |
|
|
|
City of Loudon, Loudon Utilities Board Loudon, TN
|
Water Treatment Plant Expansion to 20 MGD DIVISION II - Treatment Facilities
|
7/14/2011
|
Bid Results
Planholders List
|
| Notes: | The scope of the Project is to expand the existing water treatment plant from 15 to 20 MGD, and is divided into the following Divisions: Division I: Construction of the following new facilities: Raw Water Intake Screens (five submerged barrel type screens) and 48-inch intake pipe, approximately 400 feet into the Tennessee River Raw Water Pump Station No. 2, including space for three 7 MGD vertical turbine pumps (two installed), electrical room with VFDs, and air burst system for intake screen cleaning Modifications to the following existing facilities: Raw Water Pump Station No. 1, including demolition of the existing screen, connection of the new 48-inch intake pipe to the station, and replacing the existing utility company power feed with power (normal and standby) from the new RWPS No. 2. Division II: Construction of the following new facilities: Electrical Building to consolidate multiple utility feeds and distribute standby power, including paralleling switchgear Standby Power Generation Facility including one 1,500 kW diesel engine generator and fuel containment pad High Service Pump Station including space for five 8 MGD vertical turbine pumps (two installed) with VFDs (installed in adjacent electrical building) Chemical Building No. 1 which will house chemical feed systems for pre-treatment chemicals, with nearby bulk storage of pre- and post- treatment chemicals Flocculation Basin No. 6 and Sedimentation Basins No. 7 and 8 including turbine flocculators and sludge collection equipment Filter Building Addition including new Filters No. 7 and 8 Modifications to the following existing facilities: Replacement of existing walking-beam flocculators with turbine type flocculators Replacement of sludge collection mechanism in Sedimentation Basins 1 and 2 Rehabilitation of existing Filters No. 1 through 4, including replacement of filter media and underdrains, and the addition of air scour capabilities. Filter controls will also be replaced. Modifications to the existing chemical room in the Filter and Control Building including addition of bulk sodium hypochlorite feed systems, demolition of existing chlorine gas facilities, and conversion of the chlorine room into restrooms and an office Replacement of the existing control and monitoring system with a new fully integrated plant control system Modifications to site grading including addition of access roads and improvement of storm drainage. A mandatory Pre-Bid Conference will be held at the offices of the Owner, 201 Alma Place, Loudon, Tennessee 37774 at 9:00 a.m. local time, on May 17, 2011, and will be immediately followed by a mandatory site visit to the Loudon Water Treatment Plant, 1403 Grove Street, Loudon, Tennessee 37774. A bid submitted by a bidder not having attended the Pre-Bid Conference and site visit will not be opened. |
|
|
|
City of Loudon, Loudon Utilities Board Loudon, TN
|
Water Treatment Plant Expansion to 20 MGD DIVISION I
|
7/14/2011
|
Bid Results
Planholders List
|
| Notes: | The scope of the Project is to expand the existing water treatment plant from 15 to 20 MGD, and is divided into the following Divisions: Division I: Construction of the following new facilities: Raw Water Intake Screens (five submerged barrel type screens) and 48-inch intake pipe, approximately 400 feet into the Tennessee River Raw Water Pump Station No. 2, including space for three 7 MGD vertical turbine pumps (two installed), electrical room with VFDs, and air burst system for intake screen cleaning Modifications to the following existing facilities: Raw Water Pump Station No. 1, including demolition of the existing screen, connection of the new 48-inch intake pipe to the station, and replacing the existing utility company power feed with power (normal and standby) from the new RWPS No. 2. Division II: Construction of the following new facilities: Electrical Building to consolidate multiple utility feeds and distribute standby power, including paralleling switchgear Standby Power Generation Facility including one 1,500 kW diesel engine generator and fuel containment pad High Service Pump Station including space for five 8 MGD vertical turbine pumps (two installed) with VFDs (installed in adjacent electrical building) Chemical Building No. 1 which will house chemical feed systems for pre-treatment chemicals, with nearby bulk storage of pre- and post- treatment chemicals Flocculation Basin No. 6 and Sedimentation Basins No. 7 and 8 including turbine flocculators and sludge collection equipment Filter Building Addition including new Filters No. 7 and 8 Modifications to the following existing facilities: Replacement of existing walking-beam flocculators with turbine type flocculators Replacement of sludge collection mechanism in Sedimentation Basins 1 and 2 Rehabilitation of existing Filters No. 1 through 4, including replacement of filter media and underdrains, and the addition of air scour capabilities. Filter controls will also be replaced. Modifications to the existing chemical room in the Filter and Control Building including addition of bulk sodium hypochlorite feed systems, demolition of existing chlorine gas facilities, and conversion of the chlorine room into restrooms and an office Replacement of the existing control and monitoring system with a new fully integrated plant control system Modifications to site grading including addition of access roads and improvement of storm drainage. A mandatory Pre-Bid Conference will be held at the offices of the Owner, 201 Alma Place, Loudon, Tennessee 37774 at 9:00 a.m. local time, on May 17, 2011, and will be immediately followed by a mandatory site visit to the Loudon Water Treatment Plant, 1403 Grove Street, Loudon, Tennessee 37774. A bid submitted by a bidder not having attended the Pre-Bid Conference and site visit will not be opened. |
|
|
|
City of Kingston, Tennessee Kingston, TN
|
Kingston Wastewater Treatment Plant Expansion and Downtown Pump Station Improvements
|
6/30/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of upgrading an existing wastewater treatment facility including new headworks screening structure, grit tank, oxidation ditch splitter box, equalization tank, oxidation ditch, clarifier splitter box, secondary clarifiers, return activated sludge pump station, return activated sludge splitter box, plant drain pump station, septage receiving pump station, modifications to the existing effluent pump station, modifications to the existing sodium hypochlorite feed system, modifications to the existing Downtown Pump Station No. 1, modifications to the plant electrical system, and associated plant piping and site improvements. Bidder Pre Qualification: Pre qualification of Bidders has been completed. Only Bids submitted by properly pre-qualified Bidders will be opened. |
|
|
|
Unified Government of Athens-Clarke County Athens, GA
|
Barnett Shoals Sewer Rehabilitation Bid #00483
|
6/9/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of furnishing all personnel, superintendence, skilled and unskilled labor, materials, equipment, services, and all work necessary for cleaning, videoing and relining approximately 16,000 feet of 8-inch to 12-inch diameter sanitary sewer piping using the Cured-In-Place Piping (CIPP) method; raising and installing water-proof frames and covers on associated manholes; rehabilitating approximately 700 vertical feet of 4-foot diameter manoles; replacing or relining associated service connections; constructing approximately 280 feet of 8-inch to 12-inch sanitary sewer; approximately 80 feet of 16-inch bore and jack steel casing; service lateral connections, cleanouts and associated appurtenances. Only sealed bids from pre-qualified vendors will be accepted. A MANDATORY pre-bid conference to respond to any questions related to the details of this project will be held at 10:00 A.M. ET, THURSDAY, MAY 26, 2011, at Athens-Clarke County Water Resources Center, 780 Barber Street, Athens, Georgia 30601. Potential bidders are REQUIRED to attend. |
|
|
|
Columbus Consolidated Government Columbus, GA
|
Wilson Camp Landfill Satilla Closure
|
4/27/2011
|
Bid Results
Planholders List
|
| Notes: | The Project will consist of the construction and installation of the polymeric marine mattress, clearing and grubbing, regrading of slopes, disposal of waste material excavated, providing and placement of soils for 24-inch final cover, permanent grassing, erosion and sedimentation measures, permanent access road construction, and resurfacing and repairing the existing asphalt. A MANDATORY Pre-Bid Conference is schedule at 11:00 AM (Eastern) on Friday, March 25, 2011. A MANDATORY guided tour will be conducted of the riverbank area via Owner-approved watercrafts. Vendors shall convene in the Oxbow Environmental Learning Center, located at 3535 South Lumpkin Rd., Columbus, GA. Vendors will be allowed a 10-minute grace period. The City will not consider bids from vendors who are not present within the 10-minute grace period. |
|
|
|
City of Madison, Georgia Madison, GA
|
Energy Efficiency and Conservation Block Grant Program
|
4/21/2011
|
Bid Results
Planholders List
|
| Notes: | The Project will include the implementing of a DOE Energy Grant initiative to reduce electrical consumption, through upgrading pumping system motors and operations. The work at the Madison WTP includes replacing four pump motors ranging from 20 HP to 50 HP, with premium efficiency motors, including mounting equipment and couplings for the existing pumps. The work at the North Oconee WTP includes replacing 150-HP pump motor and 75-HP pump motor with premium efficiency motors rated for variable frequency drive (VFD) operation, including mounting equipment and couplings for the existing pumps; new VFDs located in a new VFD room; replacing constant speed starters with breakers to feed the VFDs; constructing a new air-conditioned block wall VFD room within the existing pump room; installing new VFDs, lighting, receptacles, instrumentation and air-conditioning system in the VFD room. |
|
|
|
Gwinnett County Department of Community Services Lilburn, GA
|
Yellow River Post Office Site Development
|
4/14/2011
|
Bid Results
Planholders List
|
| Notes: | The Project involves passive park development of a historic Gwinnett County site. Project is to include a decel lane, parking, restroom, signage, trail system and landscaping. A pre-bid conference is scheduled for 10:00 a.m. on March 31, 2011 at the Gwinnett County Purchasing Offfice, 75 Langley Drive, Lawrenceville, GA 30046. All contractos are urged to attend. Questions regarding bids should be directed to Shelley McWhorter, Purchsing Associate III, at shelley.mcwhorter@gwinnettcounty.com or by calling 770-822-8734, no later than April 1, 2011. Bids are legal and binding upon the bidder when submitted. All bids should be submitted in duplicate. |
|
|
|
St. Bernard Parish Government, Louisiana Chalmette, LA
|
Group 3 Canal Crossing Repairs
|
3/29/2011
|
Bid Results
Planholders List
|
| Notes: | The project consists of minor roadway, drainage repairs, and pedestrian/vehicular safety related works at the project sites. Work includes the removal of the exisiting pavement and drainage pipes, repair and/or installation of new roadway sections, drainage pipe, canal bank reshaping, grading, slope stabilization, and/or ADA compliant sidewalks. A MANDATORY Pre-Bid Conference will be held Tuesday, March 22 at 2:00 PM at the St. Bernard Parish Government Department of Public Works, 1125 E. St. Bernard Highway, Chalmette, LA. All bidders must attend and sub-contractors are encouraged to attend. |
|
|
|
Unified Government of Athens-Clarke County Athens, GA
|
Middle Oconee 36-Inch Sanitary Sewer River Crossing Bid #00480
|
3/3/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: construction of approximately 300 linear feet of 36-inch ductile iron pipe including 120 linear feet of sub-aqueous installation with four steel H-pile pipe supports, approximately 40 linear feet of 24-inch ductile iron pipe, two 10-foot-diameter manholes, erosion control and associated appurtenances. ONLY BIDS FROM PRE-QUALIFIED VENDORS WILL BE ACCCEPTED. A pre-bid conference to respond to any questions related to the details of this project will be held at 10:00 a.m. ET, Thursday, February 17, 2011, at Middle Oconee WRF Conference Room, 400 Will Hunter Road, Athens, Georgia 30605. Potential bidders are encouraged to attend. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Lift Station No. 24 Upgrades and Sewer Extension
|
2/24/2011
|
Bid Results
Planholders List
|
| Notes: | The Project will include the upgrade of the Lift Station No. 24 from a capacity of approximately 1,100 gpm to 1,470 gpm by the addition of a third, equal size pump, associated piping and valve additions and electrical and instrumentation upgrades; replacing approximately 200 feet of existing 12-inch gravity sewer with 16-inch ductile iron pipe; constructing approximately 1,000 feet of 12-inch polyvinyl chloride pipe gravity sewer extension; 1,540 square yards of sidewalk replacement; and erosion and sedimentation control. |
|
|
|
Yadkin County, North Carolina Yadkinville, NC
|
Courtney-Huntsville Area Water Infrastructure Improvements Project
|
2/23/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 8,900 LF of 6-inch PVC water main, 1,200 LF of 6-inch DIP water main, 40 LF of 4-inch DIP water main, 500 LF of 2-inch PVC water main, 45 LF of 12-inch Jack and Bore, valves, hydrants, 52 metered services, and associated appurtenances. The work will be awarded in one Contract. A pre bid meeting will be held at 10:00 am February 1, 2011 at the Yadkin County Commissioners Meeting Room 217, East Willow Street Yadkinville, NC 27055. |
|
|
|
Unified Government of Athens-Clarke County Athens, GA
|
Barnett Shoals Sewer Rehabilitation RFPQ #00483
|
2/17/2011
|
Bid Results
Planholders List
|
| Notes: | The work included in this project consists of furnishing all personnel, superintendence, skilled and unskilled labor, materials, equipment, services, and all work necessary for cleaning, videoing and relining sanitary sewer piping using the Cured In-Place Piping (CIPP) method; raising and installing water-proof rings and covers on associated manholes; and replacing or relining associated service connections as well as installing sanitary sewer manholes, sewer piping, service lateral connections, cleanouts and associated appurtenances. The pre-qualification application and qualification requirements may be obtained at Georgia Procurement Registry or ACCUG Bid Posting (http://www.athensclarkecounty.com/Bids.aspx) or via e-mail request to mack.washington@athensclarkecounty.com or fax (706-613-1978). Include your company name, address, point of contact, fax number, and phone number with your e-mail or fax request. Applications for pre-qualification will be received at the office of the Unified Government of Athens-Clarke County, Purchasing Division/Finance Department, 375 Satula Avenue, Athens, Georgia 30601, until 2:00 P.M. ET, Thursday, February 17, 2011. Any applications received after the specified time will not be considered. All applicants submitting pre-qualification documentation will be notified of their status approximately two to three weeks after the submittal deadline. |
|
|
|
Georgetown County Water & Sewer District Georgetown, SC
|
West Georgetown County Water Improvements -Phase 1, Division 1A- Booster Pump Station, Reservoir and Production Well
|
2/17/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of furnishing all materials, equipment and performance of all labor necessary to construct the following major elements: one 156 foot diameter, 2.5 million gallon prestressed concrete water reservoir including all piping and accessories; one masonry booster pumping station with 1,600 gpm and 700 gpm vertical turbine pumps and gas chlorination system; one 850 foot deep, 475 gpm production well and well pump; 1,552 linear feet of 20-inch ductile iron pipe water main and appurtenances; and all related yard piping, process piping, instrumentation, electrical equipment and wiring, and site improvements. A pre bid meeting will be held for all Bidders at 2:00 p.m., local time, January 27, 2011, at the project site; S.C. Highway 51 (Browns Ferry Road) at the International Paper Company Canal. All Bidders are encouraged to attend. |
|
|
|
Louisville Water Company Louisville, KY
|
Crescent Hill Water Treatment Plant Coagulant Storage and Feed System Improvements
|
2/9/2011
|
Bid Results
Planholders List
|
| Notes: | The Project includes modification of an existing 3,050 square foot concrete building to house six 18,300-gallon Fiber Reinforced Polymer (FRP) coagulant storage tanks, two 4,000-gallon FRP polymer storage tanks and associated feed pumps and equipment required to meter and feed coagulant and polymer to chemical application points at the Water Treatment Plant (WTP); removing the existing scrubber and associated ductwork; removing existing chlorination equipment, removing the existing floor, removing the existing roof, and providing a new floor and roof; raising the top of the walls of the building; reconstructing the roof of the building with hollow core slabs; providing chemical feed piping for coagulant and polymer; removing associated site, architectural, mechanical, electrical, and instrumentation work; removing below ground concrete coagulant storage tank and the existing coagulant feed equipment; and removing existing polymer feed equipment. See Technical Specifications for additional details. A mandatory pre-bid meeting to discuss the project will be held on January 25, 2011 at 10:00 A.M. local time in the Ramada Inn Zorn, located at 1041 Zorn Avenue, Louisville, Kentucky 40207. Attendance at this meeting is mandatory for all prime bidders and encouraged for potential subcontractors and suppliers. After the meeting, a tour of the Project site will be conducted. Additional site visits will be scheduled with exact dates and times announced at the pre-bid meeting. The Project site is located at the Crescent Hill Water Treatment Plant, 3018 Frankfort Avenue, Louisville, KY 40206. Attendance at Project site tour is highly recommended. Immediately prior to the pre-bid meeting, 9:00 A.M. 10:00 A.M., a Minority and Womens Enterprise Networking Opportunity will be conducted at the Ramada Inn Zorn. |
|
|
|
Columbus Consolidated Government Columbus, GA
|
Flood Abatement Project - 6th Avenue and Side Streets System Contract II
|
1/19/2011
|
Bid Results
Planholders List
|
| Notes: | The Project consists of sewer and water system improvements including but not limited to: approximately 550 feet of 8-foot by 6-foot box culvert; 790 feet of 8-foot by 8-foot box culvert; 1,420 feet of 10-foot by 8-foot box culvert; 420 feet of 12-foot by 8-foot box culvert; 1,110 feet of twin 10-foot by 8-foot box culvert; 820 feet of twin 12-foot by 8-foot box culvert; 1,280 feet of 14-foot by 12-foot box culvert; 1,560 feet of 72-inch RCP gravity sewer; 1,110 feet of 60-inch RCP gravity sewer; 780 feet of 54-inch RCP gravity sewer; 630 feet of 48-inch RCP gravity sewer; 330 feet of 42-inch RCP gravity sewer; 130 feet of 36-inch RCP gravity sewer; 30 feet of 30-inch RCP gravity sewer; 990 feet of 24-inch RCP gravity sewer; 70 feet of 18-inch RCP gravity sewer; 410 feet of 15-inch RCP gravity sewer; 5,800 feet of 16-inch DIP storm drain; 280 feet of 16-inch water main; 190 feet of 12-inch water main; 1,630 feet of 8-inch water main; 220 feet of 6-inch water main; 2 railroad crossings; 150,000 square yards of asphalt; 33,000 feet of curb and gutter; hardscape and landscape improvements; erosion and sedimentation control; and all associated restoration connections and appurtenant work. |
|
|
|
Unified Government of Athens-Clarke County Athens, GA
|
Middle Oconee 36-inch Sanitary Sewer River Crossing RFPQ #00480
|
1/6/2011
|
Bid Results
Planholders List
|
| Notes: | The work included in this project consists of furnishing all personnel, superintendence, skilled and unskilled labor, materials, equipment, services, and all work necessary for the installation of approximately 320 linear feet of 36-inch ductile iron pipe including 120 linear feet of sub-aqueous installation with four H-pile-type pipe supports, two 10-foot-diameter manholes, erosion control and associated appurtenances. All work shall be according to construction plans and contract documents. Inquiries regarding proposals should be made to Julie Ann Donahue, CPPB, Purchasing Administrator, at (706) 613-3066 or juliedonahue@co.clarke.ga.us, or Toro Holt, Senior Buyer (706) 613-3068, fax (706) 613-1975 or ToroHolt@co.clarke.ga.us. Technical questions may be directed to Melody Melton, Jordan, Jones & Goulding, at fax (706) 549-0423 or Melody.Melton@jacobs.com. All questions that are to be given consideration must be received no later than Thursday December 30, 2010 (Minimum of 5 business days before Opening). Any and all such interpretations and any supplemental instructions will be in the form of written Addenda to the RFPQ which, if issued, will be faxed or emailed to all prospective Applicants (at the respective addresses furnished) prior to the Application submittal deadline. Failure of Applicants to receive or acknowledge any Addendum shall not relieve them of any obligation under the RFPQ. All Addenda shall become part of the RFPQ. |
|
|
|
The Housing Authority of Columbus Columbus, GA
|
Baker Village - Cupola Place Extension
|
1/5/2011
|
Bid Results
Planholders List
|
| Notes: | The Project site comprises approximately 60 acres. Phase 1 and 2 construction consisted of new mixed use, mixed income, affordable multifamily housing and this work is now complete. Phases 1 and 2 are located at the northern end of the site and contain a total of 296 affordable housing units. Demolition of existing development has been completed. This contract will cover the road extension of Cupola Place which is to be located on the east side of Phase 2. Cupola Place will be extended approximately 410 LF from Vine Street to Grapevine Trail. New curb and gutter, 5.5 feet sidewalks on both sides of road, and additional storm drainage will be required. A Pre-Bid Conference will be held on December 14, 2010, at 10:00 a.m. at the offices of the Housing Authority of Columbus, Georgia, 1000 Wynnton Road, Columbus, Georgia 31906. All bidders are encouraged to attend. |
|
|
|
City of Cedartown, Georgia Cedartown, GA
|
Cedartown Main Street Streetscape Phase 2
|
12/9/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of demolition, grading, excavation, milling, erosion control and other related construction activities, including reconstruction of approximately 2,700 square yards of concrete sidewalk and accompanying header curb, milling of 12,400 square yards of asphalt and subsequent repaving, removal of 2,300 square yards of pavement, installation of storm drains, concrete pavers, signing and marking, granite curbed tree planters, site furnishings, landscaping, lighting and electrical work. NOI and NPDES monitoring is not required for this Project. |
|
|
|
Macon Water Authority Macon, GA
|
Lower Poplar WRF Digester Improvements
|
11/30/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate improvements to anaerobic digesters at the Lower Poplar Water Reclamation Facility. The work generally consists of two 4.2 MBTU/hr digester gas fired hot water fire tube boilers and associated appurtenances; two 500 gpm spiral heat exchangers; hot water circulation pumps; associated gas and hot water piping; associated electrical and mechanical/ventilation improvements for NFPA 820 compliance; liquid propane yard piping; and instrumentation and controls work. A mandatory pre-bid meeting will be held at the Macon Water Authority`s 2nd floor Board Room at 10:00 A.M. on Tuesday the 9th of November, 2010. A bid submitted by a Bidder which did not attend the pre-bid conference will not be opened. |
|
|
|
Macon Water Authority Macon, GA
|
Stormwater Improvement Projects - Group 5
|
11/23/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of stormwater facilities improvements at one site, including the following: Site #38 Walnut Street Lane: Replacing 36-inch x 50-inch arched brick storm sewer with approximately 350 feet of 54-inch reinforced concrete pipe, five storm structures, a 10 foot section of 15-inch and 24-inch reinforced concrete pipe, approximately 11 tap connections, repairing a portion of Second Street, and replacing a portion of Walnut Street Lane. A mandatory pre-bid conference will be held at the Macon Water Authority, 790 Second Street, Macon, Georgia on Thursday, November 4, 2010 at 10:00 A.M. An optional tour of the Project sites will be conducted by the Engineer after the pre-bid conference. All potential attendees are requested to notify Randy Smith (email rosmith@maconwater.org or 478-464-5635 ext 5642) of their tentative attendance so that the proper mass transportation can be arranged for the site tour. |
|
|
|
City of Palmetto, Georgia Palmetto, GA
|
Water Plant Improvements Phase III
|
11/18/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of improvements to the existing water treatment facility including addition of a new vertical turbine filter backwash water pump; a pair of filter air scour blowers to supply existing filter underdrain air distribution system; associated piping, valves, and interconnections; coordination of new manual sequential air/water backwash sequence; and associated electrical and instrumentation work. |
|
|
|
Spartanburg Water Spartanburg, SC
|
Lawson Fork-Fairforest Upgrade-Phase 2 Blower Addition-Fairforest WWTP
|
10/28/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of furnishing and installing a new centrifugal aeration system blower and associated controls and piping modifications in an existing building. |
|
|
|
Newton County Water & Sewerage Authority Covington, GA
|
Yellow River 1.0 MGD WWTP Flood Improvements and Rehabilitation
|
10/28/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of providing four fixed aerators in existing Aeration Basins 1 and 2; modification of the existing concrete pedestals to support the aerators; re-working aeration basin joints; providing equipment platforms for the aerators; refurbishing the weir gates at Aeration Basins 1 and 2; rehabilitating existing Clarifiers 1, 2 and 3; adding a new chemical feed pipe at the existing Grit Removal / Classifier Pad; partial removal of the existing fence; repairing and grading the dike surrounding the plant, including raising the contours, reestablishing ground cover; constructing concrete flood protection wall with fence on top, and the entrance gate re-installed. The Contractor shall coordinate the wiring of the new equipment with the electrical work performed under a separate contract. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
South Columbus Water Resource Facility Upgrades
|
9/30/2010
|
Bid Results
Planholders List
|
| Notes: | The project consists of the following: Install two new vortex grit chambers and appurtenances to improve grit removal performance; convert the basins formerly used as aerobic digesters to bioreactors and integrate these basins with the four existing bioreactors into a biological treatment train; replace the aeration equipment in all bioreactors with a fine-bubble aeration system; refurbish the bioreactors to add flexibility of operation; replace the air-lift return sludge pumps with submersible pumps; increase the capacity of the waste sludge line; and install baffles in the chlorine contact tanks. The Instructions to Bidders will contain technical experience requirements associated with determining a Bidder being responsible. To obtain a copy of such experience requirements free of charge prior to purchasing the Contract Documents, one may contact Theresa Sullivan at 678-333-0381. Such information will not be distributed prior to the project advertisement. |
|
|
|
City of Gainesville, Georgia Gainesville, GA
|
Cedar Creek Water Treatment Plant Construction Manager at Risk RFP
|
9/30/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: design consultation and construction of the new Cedar Creek Water Treatment Plant including: raw water pump station upgrade, raw water mains; filtration facilities; clearwell; high service pumping; chemical storage and feed systems; solids handling lagoon; finish water mains; and all associated site, architectural, mechanical, electrical, and instrumentation and control work. A mandatory Pre-Proposal Conference and Site Tour will be held on September 17, 2010 at 10:00 am at the offices of the Owner, 757 Queen City Parkway, Gainesville, Georgia 30501. A site tour conducted by the Owner will be held immediately after the Conference. A Proposal submitted by an entity which did not attend the Pre-Proposal Conference and Site Tour will not be opened. Request for Proposal Documents will be available on August 30, 2010. To obtain bidding documents, please forward your request to the office of the Engineer, Jordan, Jones and Goulding, Inc., 6801 Governores Lake Parkway, Building 200, Norcross, GA 30071, Attn: Theresa Sullivan, email: theresa.sullivan@jacobs.com, phone number: 678-333-0381. No fee will be charged for the RFP and it will be distributed in hard copy or Portable Document Format (pdf) at the choice of the recipient. Requests cannot be processed without all of the following information: (1) Project Name; (2) Purchaser Company Name, (3) Purchaser Street Address; (4) Purchaser Phone Number; (5) Purchaser Fax Number; (6) Contact Person; (7) e-mail address, if available; (8) Purchaser`s Federal Express or UPS account number if quicker delivery is desired. Requests received after 2:00 pm, eastern time, may be processed the following day. |
|
|
|
Columbia County, Georgia Evans, GA
|
Betty`s Branch Way Culvert Replacement
|
9/23/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of replacing an existing 8-foot diameter corrugated metal pipe with a new 72-foot long, 16-foot wide concrete arch span open bottom bridge, including associated removal and replacement of pavement and curb and gutter, as well as erosion and sedimentation control. A non-mandatory Pre-Bid Conference will be held for all Bidders at 2:00 p.m., local time, September 9, 2010, at the Columbia County Water Utility Office Conference Room, 4325 Evans-to-Locks Road, Evans, Georgia 30809. All interested parties are invited to attend. |
|
|
|
Gwinnett County Department of Community Services Suwanee, GA
|
Ivy Creek Greenway Phase I Section I
|
9/17/2010
|
Bid Results
Planholders List
|
| Notes: | The project consists of 1850 lf of 12 foot wide boardwalk, approximately 1590 lf of 12 foot wide multiuse trails, approximately 3050 lf of 10 foot wide multiuse trails, approximately 205 lf of 6 foot-10 foot wide pervious concrete trail, 24 lf wood trail bridge, construction of wood retaining walls (< 4 foot tall), Wooden boardwalk overlooks, metal guardrails and handrails, one new metal and stone signage kiosk, bench, trash receptacle, bicycle rack and bollards, trail directional and safety signage, asphalt patching, concrete paving and curb and gutter, concrete steps, landscaping, and all associated work, including clearing and grubbing, grading, sediment and erosion control, and drainage. Project is located in George Pierce Park, 55 Buford Highway, Suwanee, GA. A pre-bid conference is scheduled for 10:00 a.m. on September 7, 2010 at the Gwinnett County Purchasing Office, 75 Langley Drive, Lawrenceville, GA 30046, 2nd Floor. All contractors are urged to attend. Questions regarding bids should be directed to Shelley McWhorter, Puchasing Associate III, Shelley.mcwhorter@gwinnettcounty.com or by calling 770-822-8734, no later than September 8, 2010. |
|
|
|
Town of Lexington, South Carolina Lexington, SC
|
Gibson Road Sidewalk
|
9/16/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: Clearing and grubbing within SCDOT right-of-way, Construction of 9,200 LF of new 5-foot wide sidewalk, 150 LF on the existing bridge deck at Twelve Mile Creek with Aluminum Handrail, ADA compliant ramps, Crosswalks and repairs to the existing 4-foot wide sidewalk. There will be a non-mandatory pre-bid conference on Thursday, September 2, 2010 at 2:00 P.M. in the Eli Mack Sr. Room in the basement of Town Hall, 111 Maiden Lane, Lexington, SC 29072. |
|
|
|
Macon Water Authority Macon, GA
|
Stormwater Improvement Projects Group No. 4 - Revised
|
8/31/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of stormwater facilities improvements of three different sites, including the following: Site #18-Kingsbury Drive: Replacing twin 36-inch pipes with approximately 45 feet of 10 foot x 5 foot box culvert, one new storm structure, 13 feet of 18-inch reinforced concrete pipe, and repairing a portion of the road. Site #61-Hyde Park: Replacing 18-inch pipe with approximately 35 feet of 18-inch reinforced concrete pipe and 64 feet of 24-inch reinforced concrete pipe, replacing 48-inch pipe with approximately 16 feet of 54-inch reinforced concrete pipe, five new storm structures, 31 feet of 18-inch reinforced concrete pipe, and repairing a portion of the road and residential driveway. Site #63-Claridge Court: Replacing 54-inch x 36-inch, 36-inch and 48-inch pipe with approximately 300 feet of 48-inch reinforced concrete pipe, three new storm structures, and repairing a portion of the road and residential yard. A mandatory pre-bid conference will be held at the Macon Water Authority, 790 Second Street, Macon, Georgia on Tuesday, August 17, 2010 at 10:00 A.M. An optional tour of the Project sites will be conducted by the Engineer after the pre-bid conference. All potential attendees are requested to notify Randy Smith (email rosmith@maconwater.org or 478-464-5635 ext 5642) of their tentative attendance so that the proper mass transportation can be arranged for the site tour. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
North Columbus Water Resource Facility Upgrades
|
8/26/2010
|
Bid Results
Planholders List
|
| Notes: | The project will include: Basin 1 Flocculation and Settling Improvements, Basin 2 Flocculation and Settling Improvements, Basin 3 Flocculation and Settling Improvements, Filter Buildings 1 and 2 Media Replacement, Filter Buildings 1, 2, and 5 Valve Replacement, Partial Yard Valves Replacement, Raw Water Pump Motor and Starter Replacement, Raw Water Intake Structure Improvements, High Service Pump Motor and Starter Replacement, Basin 6 Flocculation and Settling Improvements. Remainder Yard Valves Replacement. The Instructions to Bidders will contain technical experience requirements associated with determining a Bidder being responsible. To obtain a copy of such experience requirements free of charge prior to purchasing the Contract Documents, one may contact Theresa Sullivan at 678-333-0381. Such information will not be distributed prior to the project advertisement. |
|
|
|
Barnwell County, South Carolina Barnwell, SC
|
2010 Roadway Improvements
|
8/12/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of 2010 Roadway Improvements that include, Marble Lane, Londe Lane, Poinsettia Court, Rookery Row, and Barnwell County Hospital Parking Lot Patching, Paving and Marking. There will be a non-mandatory pre-bid conference on Thursday, July 29, 2010 at 2:00 P.M. at the County Agricultural Building, 34 Pechman Street, Barnwell, SC 29812 next door to the County Administration Building. |
|
|
|
Berkeley County Water & Sanitation Authority Charleston, SC
|
2009 St. Stephen CDBG Sewer Rehabilitation Project CDBG/HUD Project No.: 4-CI-09-019
|
8/5/2010
|
Bid Results
Planholders List
|
| Notes: | The project will include sewer rehabilitation of about 5,928 feet of 8-inch diameter gravity sewer using a cured in place pipe method (CIPP) lining. Also includes the lining of 49 service connections. Project funding is being provided by CDBG and federal requirements will apply to the contract. |
|
|
|
City of Morrow, Georgia Morrow, GA
|
Jesters Creek Pedestrian Pathway System Phase 2
|
8/3/2010
|
Bid Results
Planholders List
|
| Notes: | The work to be completed consists of furnishing all labor, materials, and equipment for the construction of approximately 3,200 L.F. of concrete pathway and boardwalks and two bridges. Pedestrian crossing and street medians at Morrow Road are an additive alternate. A non-mandatory prebid conference for prospective BIDDERS will be held at Morrow City Hall, located at the Morrow Center at 1180 Southlake Circle, Suite 100, Morrow, GA, on Monday, July 12, 2010 at 10:00 AM. |
|
|
|
St. Bernard Parish Government, Louisiana Chalmette, LA
|
FEMA Canal Crossings Project No. PW #18815 Sites 1 through 4 PW #18831 Sites 1 through 4
|
8/3/2010
|
Bid Results
Planholders List
|
| Notes: | This project consists of furnishing all supervision, labor, equipment, and materials necessary minor roadway, drainage repairs, and pedestrian/vehicular safety related works at the project sites along Bayou Road, E. Judge Perez Drive, and/or Reunion Drive. Work includes the removal of the existing pavement and drainage pipes, repair and/or installation of new roadway sections, drainage pipe, canal bank reshaping, grading, guardrails, slope stabilization, and/or ADA compliant sidewalks. A MANDATORY Pre-Bid Conference will be held on Tuesday, July 27, 2010 at 2:00 PM at the St. Bernard Parish Government Department of Public Works, 1125 E. St Bernard Highway, Chalmette, Louisiana. All bidders must attend and sub-contractors are encouraged to attend. |
|
|
|
Jefferson Parish, Louisiana Jefferson, LA
|
East and West Water Treatment Plant Re-Painting Contract
|
8/3/2010
|
Bid Results
Planholders List
|
| Notes: | The improvements include furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate: surface preparation and re-painting of the interior and exterior walls and ferrous metal piping, valves, and structural elements of selected portions of the East Bank Water Treatment Plant located at 3600 Jefferson Highway, Jefferson, Louisiana 70121 and West Bank Water Treatment Plant located at 4500 West Bank Expressway, Marrero, Louisiana 70072. A MANDATORY Pre-Bid Conference will be held on June 30, 2010 at 10:00 a.m. at the office of the Water Department at 1221 Elmwood Blvd., Suite 909, Jefferson, LA 70123. All bidders are required to attend the pre-bid conference and pre-bid meetings. A MANDATORY Pre-Bid Site Meeting will be held on June 30, 2010 (same day as pre-bid conference), at 1:30 PM at the East Bank Water Treatment Plant and on July 1, 2010 (day after pre-bid conference), at 9:00 AM at the West Bank Water Treatment Plant. |
|
|
|
Douglasville-Douglas County Water and Sewer Authority Douglasville, GA
|
Northside Wastewater Treatment Plant Flood Rehabilitation
|
7/27/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of: repairs and rehabilitation to restore the Northside Wastewater Treatment Plant back to its condition prior to the September 2009 flood. Major repairs and modifications include repairs to Influent Headworks and Pump Station, including replacement of motors, meters and local control panels; replacement and relocation of post-aeration blower; construction of a structure to support the trailer-mounted belt filter press system; repairs to Control Building, including replacement of electrical switchgear and motor control center (MCC) and variable speed drive, local control panels, replacement of mechanical building elements including the HVAC unit, water heater, the storage room ventilation fan, and architectural elements including floor tiles, acoustical ceiling tiles, metal doors, windows, casework, light switches, receptacles, and plumbing fixtures; replacement of the electric utility meter, transformer, and panel board; replacement of a 6,000-gallon chemical storage tank; general electrical site improvements; and testing and replacement as necessary of electrical wiring that was submerged at several places around the site. A non-mandatory Pre-Bid Conference will be held on July 13, 2010 at 10:00 a.m. at the offices of the Owner, 8763 Hospital Drive, Douglasville, Georgia 30134. All interested parties are encouraged to attend. |
|
|
|
City of Clarksville, Tennessee Clarksville, TN
|
Clarksville Water Treatment Plant Expansion to 28 MGD
|
7/15/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: a new 28 MGD pressurized membrane system in a new 13,800 square foot building complete with control room, electrical room, storage, supply and restrooms; new membrane feed wet well; new 1,250 kW standby power generator; two new 10.5 MGD vertical turbine raw water pumps in the existing raw water pumping station, and new motors for the two existing pumps; modifications to the existing high service pumping station including a new 10.5 MGD horizontal split case centrifugal high service pump with VFD and electrical room addition; expansion of the existing on-site sodium hypochlorite generation system including a new brine tank, new control panel, two new rectifiers, and new feed pumps; new pump stations at the existing equalization basin and solids handling tank; modifications to the existing fluoride and corrosion inhibitor feed systems; and associated site, architectural, mechanical, electrical, and instrumentation and controls work. A MANDATORY Pre-Bid conference will be held for all Bidders at 9:00 a.m., local time, June 22, 2010 at the Clarksville Water Treatment Plant, 1041 Pumping Station Road, Clarksville, Tennesee 37043. A Bid submitted by a Bidder not having attended the Pre-Bid conference will not be opened. |
|
|
|
Unified Government of Athens-Clarke County Athens, GA
|
J.G. Beacham WTP Sludge Lagoon Cleanout Bid #00453
|
7/8/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the removal, dewatering and disposal of sludge solids from the existing sludge lagoon at the J. G. Beacham WTP, erosion and sedimentation control and appurtenances. A pre-bid conference to respond to any questions related to the details of this project will be held at 10:00 a.m. ET, June 15, 2010, at Athens-Clarke Water Resources Center, 780 Barber Street, Athens, Georgia 30601. Potential bidders are encouraged to attend. To obtain bidding documents, please forward your check for $100.00 to Jordan, Jones & Goulding, 6801 Governors Lake Parkway, Building 200, Norcross, GA 30071, Attn: Theresa Sullivan. No partial sets will be sold. Shipment will be via delivery service - two-day delivery. Other shipping will be at the purchaser`s additional expense. The purchaser may expedite the purchase by faxing a copy of the check to Theresa Sullivan at 678-333-0701, or by scanning and e-mailing same to Theresa Sullivan at theresa.sullivan@jacobs.com, with the original check followed via US Postal Service or via delivery service. Purchases will NOT be processed without all of the following information: (1) Project Name; (2) Purchaser Company Name, (3) Purchaser Street Address; (4) Purchaser Phone Number; (5) Purchaser Fax Number; (6) Contact Person; (7) e-mail address, if available; (8) Purchaser`s Federal Express or UPS account number if quicker delivery is desired. Requests received after 2:00 pm, eastern time, may be processed the following day. |
|
|
|
Jefferson Parish, Louisiana Gretna, LA
|
Harvey Wastewater Treatment Plant Pump Station and Force Main
|
6/29/2010
|
Bid Results
Planholders List
|
| Notes: | The improvements include furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate: improvements to the effluent pump station and force main, including replacement of pump check valves, surge valves, and air release valves. Replacement of the vacuum pump and appurtenances is also included. Commissioning of the pump control system and related electrical work is part of the Project. A mandatory Pre-Bid Conference will be held on Monday, June 14, 2010, at 10:00 a.m. in Suite 4400 of the Purchasing Department, located at 200 Derbigny Street, Gretna, Louisiana. All bidders are encouraged to attend the pre-bid conference. |
|
|
|
Atlanta-Fulton County Water Resources Commission Johns Creek, GA
|
Atlanta Fulton County Water Treatment Plant Bulk Hypochlorite System and Filter/Plate Settler Improvements
|
6/25/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of upgrading the filter and plate settler basins on Phases 1 and 2 and converting the disinfection system to bulk deliveries of sodium hypochlorite including: providing access ladders on Phase 1 plate settlers; replacing Phase 2 plate settlers; adding underdrains and/or caps to Phase 1 and Phase 2 filters; demolishing the existing chlorine gas disinfection system; adding a new bulk hypochlorite storage and feed system and storage room; and associated site, architectural, mechanical, electrical, and instrumentation and control work. Preliminary bid results are available from the Fulton county web site at http://www.fultoncountyga.gov/county/bidss/index.php?table_name=bids&function=details&where_field=ID&where_value=2298 and then click on the link for Tabulation Sheet. |
|
|
|
City of Chattanooga, Tennessee Chattanooga, TN
|
Upper Amnicola and Tiftonia Interceptors Rehabilitation
|
6/8/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 11,500 feet of cured in place pipe sewer rehabilitation, of which approximately 6,500 feet is 48-inch, 1,900 feet is 24-inch, 1,200 feet is 18-inch, and 1,900 feet is 15-inch; approximately 425 feet of cured in place pipe rehabilitation of service laterals; rehabilitation of approximately 330 vertical feet of manholes utilizing cementitious and/or epoxy linings; reinstatement of approximately 30 service laterals with 22 by robotic means and 8 by open cut means; furnishing and installing approximately 5 chimney seal manhole inserts, 20 manhole inflow dish inserts, and 10 manhole frames and covers; and approximately 8 point repairs, ranging in size from 15-inch to 48-inch diameter pipe. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
North Columbus Water Transmission Main
|
6/3/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 2,900 feet of 42-inch, 17,000 feet of 36-inch, 1,000 feet of 30-inch ductile iron pipe water main; 410 feet of 54-inch 1,010 feet of 48-inch and 80 feet of 42-inch bore and jack steel casing; 6,000 square yards of pavement replacement; and erosion and sedimentation control. Owner will furnish and Contractor shall install all 20-inch through 36-inch gate valves (except for tapping valves) and all ductile iron pipe, fittings, gaskets, welded-on outlets, factory welded-on thrust collars and retainer glands (except for pipe and fittings downstream of outlets for blow-offs and hydrants). Bidder Pre Qualification: Pre qualification of Bidders for the Project is required. A copy of the application and qualification requirements will be an appendix to the Specifications and can also be obtained, at no cost separately from the Bidding Documents, from Jordan, Jones & Goulding at the contact point noted below. Applications for pre qualification for bidding will be received at the offices Columbus Water Works, 1421 Veterans Parkway, Columbus, Georgia 31901, until 4:00 p.m., local time, on April 27, 2010. Only Bids submitted by properly pre-qualified Bidders will be opened. *** Note change in Pre-Bid Conference date (change made via Addendum No. 2)*** A Pre Bid Conference will be held for all Bidders at 2:00 p.m., local time, May 24, 2010, at offices of Columbus Water Works, 1421 Veterans Parkway, Columbus, Georgia 31901. All Bidders are encouraged but are not required to attend. |
|
|
|
St. Bernard Parish Government, Louisiana Chalmette, LA
|
Site 3 Corinne Street @ 20 Arpent Canal Project No. PW #18832-3
|
6/1/2010
|
Bid Results
Planholders List
|
| Notes: | This project consists of furnishing all supervision, labor, equipment, and materials necessary to Construct a precast concrete bridge on Corrine Street over the 20 Arpent Canal. Work includes the removal of the existing bridge, piling, roadway surfaces and replace with new concrete piles, bridge structure, and rip rap slope protection. A MANDATORY Pre-Bid Conference will be held on Monday, May 24, 2010 at 2:00 PM at the St. Bernard Parish Government Department of Public Works, 1125 E. St Bernard Highway, Chalmette, Louisiana. All bidders must attend and sub-contractors are encouraged to attend. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Bruce Avenue Sanitary Sewer Rehabilitation
|
5/27/2010
|
Bid Results
Planholders List
|
| Notes: | The project will include constructing approximately 2,600 feet of 18-inch gravity sewer with materials including both solid wall PVC and ductile iron; 40 feet of 30-inch bore and jack steel casing; 3,200 feet of 15-inch, 200 feet of 18-inch and 1,000 feet of 24-inch cured-in-place pipe; 275 vertical feet of manhole liners and other manhole rehabilitation; plugging 8 sewers and demolishing and abandoning 8 manholes; 250 square yards of pavement removal and replacement; and erosion and sedimentation control. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Exeter Court Lift Station Upgrade
|
5/27/2010
|
Bid Results
Planholders List
|
| Notes: | The Project will include the upgrade of the Exeter Court Lift Station from a capacity of approximately 2,250 gpm to 4,500 gpm by replacement of the three pumps and associated electrical and instrumentation upgrades; replacing its existing force main with approximately 2,800 feet of 20-inch ductile iron pipe; replacement of lift station access hatches and check valves; 1,700 square yards of pavement replacement; and erosion and sedimentation control. The Owner will furnish and Contractor shall install the 20-inch cement and specialty lined ductile iron pipe for the force main construction. |
|
|
|
City of Palmetto, Georgia Palmetto, GA
|
Fayetteville Road CDBG Sidewalk Improvements
|
5/25/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of the following major elements: construction of approximately 2,600 LF of concrete sidewalks within the right-of-way on the east side of Fayetteville Road, between School Street and the Coweta County line, along with associated curbing, striping, handicap ramps, grading, drainage improvements, erosion control, and related work. A mandatory Pre Bid Conference will be held for all Bidders at 2:00 p.m., local time, May 11, 2010 at Palmetto City Hall, 509 Toombs Street, Palmetto, Georgia 30268. A Bid submitted by a Bidder not having attended the Pre Bid Conference will not be opened. |
|
|
|
City of Rome, Georgia Rome, GA
|
South Rome Pedestrian Corridor
|
5/20/2010
|
Bid Results
Planholders List
|
| Notes: | The Project includes the construction of pedestrian improvements and street repaving of South Broad Street, East Main Street and East 12th Street between Branham Avenue to Cedar Street in the City of Rome. The work consists of the construction of approximately 6,500 square yards of concrete sidewalk, 1,600 square yards of ADA concrete driveway aprons,12,800 linear feet of concrete header curb, 6,200 square feet of brick pavers, milling of 34,000 square yards of asphalt and subsequent repaving, reconstruction of storm drains, signing and marking, landscaping, lighting and electrical work, 1 traffic signal mast arm assembly and 3 traffic signal strain pole assemblies. Project includes all demolition, grading, excavation, milling, erosion control and other related construction activities. NOI and NPDES monitoring is not required for this Project. The project will have a base bid and three alternates. A pre-bid meeting will be held on May 4, 2010 at 10:00 am in the Sam King Room at City Hall/Auditorium, 601 Broad Street, Rome Georgia 30161. Interested parties are encouraged to attend. |
|
|
|
Macon Water Authority Macon, GA
|
Stormwater Improvement Projects Group No. 4
|
5/20/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of stormwater facilities improvements of four different sites, including the following: Site #18 Kingsbury Drive: Replacing twin 36-inch pipes with approximately 45 feet of 10 foot x 5 foot box culvert, one new storm structure, 13 feet of 18-inch reinforced concrete pipe, and repairing a portion of the road. Site #38 Walnut Street Lane: Replacing 36-inch x 50-inch arched brick storm sewer with approximately 300 feet of 54-inch reinforced concrete pipe, five storm structures, a 10 foot section of 15-inch and 24-inch reinforced concrete pipe, approximately 11 tap connections, repairing a portion of Second Street, and replacing a portion of Walnut Street Lane. Site #61 Hyde Park: Replacing 18-inch pipe with approximately 35 feet of 18-inch reinforced concrete pipe and 64 feet of 24-inch reinforced concrete pipe, replacing 48-inch pipe with approximately 16 feet of 54-inch reinforced concrete pipe, five new storm structures, 31 feet of 18-inch reinforced concrete pipe, and repairing a portion of the road and residential driveway. Site #63 Claridge Court: Replacing 54-inch x 36-inch, 36-inch and 48-inch pipe with approximately 300 feet of 48-inch reinforced concrete pipe, three new storm structures, and repairing a portion of the road and residential yard. A mandatory pre-bid conference will be held at the Macon Water Authority, 790 Second Street, Macon, Georgia on Tuesday, April 27, 2010 at 10:00 A.M. An optional tour of the Project sites will be conducted by the Engineer after the pre-bid conference. All potential attendees are requested to notify Randy Smith (email rosmith@maconwater.org or 478-464-5635 ext 5642) of their tentative attendance so that the proper mass transportation can be arranged for the site tour. |
|
|
|
Mecklenburg County Real Estate Services Department(MCRES) Charlotte, NC
|
Little Sugar Creek Greenway (E.10th Street to Alexander Park Connection)
|
4/22/2010
|
Bid Results
Planholders List
|
|
|
|
City of Kenner, Louisiana Kenner, LA
|
39th & California Force Main to the Chateau Transfer Station and 42nd & Erlanger Force Main to 42nd and Illinois
|
4/13/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of constructing approximately 2000 linear feet of 8-inch direct drilled pipe, 2000 linear feet of 18-inch direct drilled pipe, and 200 linear feet of 18-inch open trench pipe within the City of Kenner. Also included are four connections to existing structures and pipes, a direct drilled canal crossing, concrete pavement repair, and appurtenances. There will be a pre-bid meeting on Wednesday, March 24, 2010 at 10:00 a.m. at the Public Works Conference Room located at 1905 24th Street, Kenner, Louisiana 70062. All interested bidders are encouraged to attend. |
|
|
|
North Carolina Ecosystem Enhancement Program (EEP) Hendersonville, NC
|
Lewis Creek Stream Restoration
|
4/9/2010
|
Bid Results
Planholders List
|
| Notes: | The project consists of Restoring approximately 1,750 linear feet of Lewis Creek using natural channel design procedures. This restoration effort will consist of returning the appropriate dimension, pattern, and profile to the degraded stream. The work will include grading, installation of stabilization and habitat structures, replanting adjacent streambanks and riparian zones using native species appropriate to the area and practicing/maintaining proper sediment and erosion control. An open mandatory pre-bid meeting will be held for all interested bidders and vendors on February 24th, 2010, at 11:00 a.m. at the project site. |
|
|
|
Town of Braselton, Georgia Braselton, GA
|
SR 53 & SR 124 Intersection Realignment
|
3/30/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of construction related to relocating approximately 2,800 feet of State Route 124, including reconstruction of intersection with State Route 53 and three additional intersections, and widening and repaving of 700 feet of State Route 53; approximately 3,300 square yards of sidewalk, 13,300 cubic yards of raw embankment and 10,800 cubic yards of excavation, 100 feet of retaining walls, 4,700 feet of storm drainage piping in sizes 18 to 54 inches, and 900 feet of guard rail; signage; traffic signalization; erosion and sedimentation control; and other related construction activities. A pre-bid conference will be held on March 9, 2010 at 10:00 a.m. at the Planning and Public Utilities Building, 4986 Highway 53, Braselton, Georgia 30517. All interested parties are invited to attend. Attendance is not mandatory. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Oxbow Meadows Community Support Facilities
|
3/25/2010
|
Bid Results
Planholders List
|
| Notes: | The Project consists of approximately 5,200 feet of pedestrian trails; 2,100 feet of asphalt driveways; 1 safety pedestrian crosswalk; 1,100 square yards of asphalt parking area; 3,800 square yards of grassed parking area; 3,900 square yards of gravel parking area; 2,500 feet of two-lane gravel roadway; 150 feet of pedestrian boardwalk; boat dock area; water, sanitary, and storm water utilities; existing utilities relocation; landscaping; gates and fencing, and associated clearing, grubbing and grading. |
|
|
|
City of West Palm Beach, Florida West Palm Beach, FL
|
Bulk Hypochlorite Storage and Feed System (Rebid)
|
3/9/2010
|
Bid Results
Planholders List
|
| Notes: | The project consists of a new system that will replace an existing chlorine gas disinfection system. Work includes: demolition of the one ton cylinder chlorine gas handling system, chlorine gas piping, chlorinators, and emergency chlorine gas scrubber; providing and/or installing pumps and equipment in a new prefabricated building; providing a hypochlorite day tank; providing temporary sodium hypochlorite storage and transfer system; and associated yard piping and all appurtenances. |
|
|
|
Macon Water Authority Macon, GA
|
Stormwater Improvements Projects Group No. 2
|
1/19/2010
|
Bid Results
Planholders List
|
| Notes: | The project consists of rehabilitation of existing storm sewers by the use of cured-in-place pipe, including approximately 510 linear feet of 30-inch, 550 linear feet of 24-inch and 350 linear feet of 18-inch storm sewer; point repairs; construction of new and modifications to existing storm sewer structures; and pavement restoration. |
|
|
|
Columbus Water Works Board of Water Commissioners Columbus, GA
|
Oxbow Meadows Environmental Learning Center
|
1/15/2010
|
Bid Results
Planholders List
|
| Notes: | The Project will include clearing, grubbing and grading; 7,600 square foot environmental learning center building with architectural, structural, mechanical and electrical components; indoor and outdoor fish and reptile exhibit areas; ancillary sidewalks, driveways and landscaping; stormwater, and potable water lines; power supply lines. Alternate bids will be accepted for 824 square foot building addition and outdoor reptile tortoise area; 800 square foot entrance structure; 800 square foot elevated observation platform; bus drop-off driveway and paving. |
|
|
|
City of Kannapolis, North Carolina Kannapolis, NC
|
Second Creek Pump Station Electrical Improvements
|
1/13/2010
|
Bid Results
Planholders List
|
| Notes: | Electrical improvements to an existing pump station, namely changing the service from 2,300 volt three phase to 480 volt three phase, which will include new service conductors, new switchboard, new pump motors, new variable speed drive with self-contained air conditioning, new lighting and receptacles, new ultra sonic flow meter, demolition of existing electrical equipment and circuits, and generally upgrading to current National Electrical Code requirements. |
|
|
|
|
 |